My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. RECOMMENDED PLAN <br /> <br />TABLE 7.7-2 <br />Recommended Project Phasing Plan with Capital Cost Estimates <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Cost Estimates <br /> Phase Description ($) <br />Phase 5 <br />(2008/2009) <br /> <br />Odorous Air Construct two 14-foot-diameter, 30-foot-tall b~otowers for air $2,300,000 <br />Treatment collected from two primary cladfier centerwelLs and launders and <br />Expansion - Part 2 new GBT <br /> <br />Parallel Primary/ Construct piping, pumping, and flow split boxes to enable primary $11,000,000 <br />Secondary Flow and secondary treatment te be operated in parallel <br />Route <br /> <br />Filtration - Pad 1 Filtration: includes infrastructure/support facilities for 30 mgd of $10,100,000 <br /> filters; install filter cells sufficient for only 10 mgd <br /> <br /> Phase 5 Subtotal $23,400,000 <br />Phase 6 <br />(2009/20~ 0) <br /> <br />New Bankside Construct a new bankside outfall to accommodate up to 140 mgd $1,500,000 <br />Outfall (300 mgd less 160 mgd, which is the capacity of the existing outfall <br /> system) <br /> <br />Level II Reuse at BF Provide 1.5 mgd of Level ii reuse. Installation of dedicated reuse $3,600,000 <br /> irrigation pipeline and microspray system. Total reuse of 3.75 mgd <br /> July - August. <br /> <br />Reline Lagoons at Reline lagoons, Phase 2 - from existing MWMC CIP $1,100,000 <br />BMF - Part 2 <br /> <br /> Phase 6 Subtotal $6,200,000 <br />Phase 7 <br />(2010/2011 ) <br /> <br />Glenwood Pump From existing MWMC FY 03/04 Budget - Regional Wastewater $500,000 <br />Station Upgrade Program <br /> <br />~ncrease Digestion Fourth digester and/or conversion to thermophllic digestion to $13,800,000 <br />Capacity and achieve Class A; fourth digester is $4.8 million, thermophiJic is -$9 <br />Provide Class A million; use $13.8M in CIP and re-evaluate options in future when <br />Capability decide to go to Class A. <br /> <br />Odorous Air Construct one 14-foot-diameter, 30-foot-tall biotower for air $2,300,000 <br />Treatment collected from new dry weather headworks and conversion of the <br />Expansion - Part 3 existing air sources from biofilter to biotowers. <br /> <br />Reline Lagoons at Reline lagoons, Phase 3 - from existing MWMC CIP $1,t00,000 <br />BMF - Part 3 <br /> <br />Facility Plan Update Update to portions of the MWMC Facility Plan (FY2010/11) $150,000 <br />(FY2010/11) <br /> <br /> Phase 7 Subtotal $17,850,000 <br /> <br />MWMC_7 0_REV4.DOC 7-~7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.