Laserfiche WebLink
MWMC FACILITIES PLAN <br /> <br />TABLE 7.7-2 <br />Recommended Project Phasing Plan with CapItal Cost Estimates <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Cost Estiraates <br /> Phase Description ($) <br />Phase 8 <br /> <br />Reline ~agoons at Re~ine lagoons, Phase 4 - from existing MWMC CIP $1,100,000 <br />BMF - Part 4 <br /> <br />RepaidPartial Repaidreplace sections of the biosol~ds force main where strubite $1,000,000 <br />replacement of deposits limit pipe diameter and cannot be removed by acid wash. <br />biosolids force main <br /> <br /> Phase 8 Subtotal $2,100,000 <br />Phase 9 <br />(2012/2013) <br /> <br />Permanent Level IV Provide 2.5 mgd for permanent Level IV reuse to local $4,100,000 <br />Reuse - Part 1 greenspaces and community areas. Modify/install UV system <br /> capable of 3 mgd and modify/install piping system installed in <br /> demonstration projecL Total reuse of 5.25 mgd <br /> <br /> Phase 9 Subtotal $4,190,000 <br />Phase 10 <br />(2013/2014) <br /> <br />Filtration Expansion - Filtration: 10 mgd of filter cells for a total capacity of 20 mgd $5,050,000 <br />Part 2 <br /> <br /> Phase 10 Subtota~ $5,050,000 <br />Phase 11 <br />(2014/2016) <br /> <br />Comprehensive Comprehensive update to portions of the MW MC Facihty Plan $800,000 <br />Facility Plan (FY2014/2015) <br />(FY2014/2015) <br /> <br />North Aeration Basin Add step feed, anoxic selectors, and assume existing diffusers w{]] $6,200,000 <br />Enhancements be replaced in 15 years but main air header is not replaced. <br /> <br />Permanent Level iV Provide 2.5 - 5 mgd for permanent Leve] IV reuse, increase $9,800,000 <br />Reuse- Part 2 pumping capacity, reuse pipeline, and UV system. Total reuse of <br /> 7.75 - 10.25 mgd <br /> <br />Composting Facility Expand compostmg facility at Biosolids Management Facility - from $650,000 <br />Expansion existing MWMC CIP <br />(FY2015/2016) <br /> <br /> Phase 11 Subtotal $17,450,000 <br /> <br />Phase 12 <br />(2017/2018) <br /> <br />Operation and Update/upgrade the operations and maintenance facilities at $1,500,000 <br />Maintenance Facility WPCF <br />~mprovements <br />(FY2017/2018) <br /> <br />7-18 MWMC_7.O_REV4 DOC <br /> <br /> <br />