Laserfiche WebLink
Project Name: Level I! Reuse at the Biocycle Farm <br /> <br />Description: Provide 1.5 mgd of level I1 reuse water at the Biocycle Farm. Installation <br /> of dedicated reuse irrigation pipeline and microspray system. Tota~ reuse <br /> of 3.75 mgd in July and August. <br /> <br />Justification: <br />Project Driver: <br />Project Trigger: <br />Type of Project 100% Performance <br /> <br />Estimated Project Cost $3,600,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2009/10 <br /> <br /> Project Name: Reline Lagoons at BMF - Phase 2 <br /> Description: Reline lagoons, Phase 2 - from existing MWMC CIP. <br /> Justification: Testing has indicated that the lagoons may be leaking. <br /> Project Driver: Regulatory requirements and maintaining operational reliabi~ity~ <br /> <br /> Project Trigger: Identification of temporary storage location for contents of lagoon and <br /> installation of temporary equipment required to transfer lagoon contents. <br /> <br /> Type of Project 100% Rehabilitation <br /> <br /> Estimated Project Cost $1,100,000 <br /> (2004 Dollars): <br /> <br /> Phasing: Budgeted for FY2009/10 <br /> <br /> <br />