Laserfiche WebLink
Project Name: Gienwood Pump Station Upgrade <br />Description: Expand pump station capacity (from existing FY03/04 budget) <br /> <br />Justification: Additiona~ pumping capacity is required to increase tota~ influent pumping <br /> capacity to 277 mgd. <br /> <br />Project Driver: Systematic elimination of sanitary sewer ovedlows by the year 2010. <br /> <br />Project Trigger: Collection system computer model estimates the current wet weather <br /> peak flow to plant to be 264 mgd. Overall existing peak flow capacity is <br /> 175 mgd so them is already a capacity deficit. <br /> <br />Type of Project 100% Capacity <br />Estimated Project Cost $500,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2010/11 <br /> <br />Project Name: Additional Digestion Capacity and Class A Biosolids Production Capacity <br /> <br />Description: Add fourth digester and or convert to thermophi~ic digestion to achieve <br /> Class A. <br /> <br /> Justification: <br /> Project Driver: <br /> Project Trigger: <br /> Type of Project 66% Capacity; 34% Performance <br /> Estimated Project Cost $13,800,000 <br /> (2004 Dollars): <br /> <br /> Phasing: Budget for FY2010/11 <br /> <br /> <br />