My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL STRATEGY <br /> <br />8.4 Evaluation of Local Funding Resources <br />MWMC will rely on monthly wastewater rates and SDCs for revenue. Financing for capital <br />projects w/il most likely be provided by revenue bonds, although MWMC would like to <br />retain the option to use t. he State Revolving Loan Fund (SRF) program administered by <br />DEQ. <br /> <br />As stated in section 8.2, MWMC is in a strong position with respect to its credit-worth/ness. <br />MWMC's sound financial management, long-term financial forecasting and planning, stable <br />operations, and a host of other qualitative indicators all show that MWMC would per£orm <br />extremely well in any assessment by a credit rating agency or other financhl body. <br /> <br />8.5 Evaluation of Federal and State Funding Resources <br /> <br />In previous financial evaluations, MWMC staff evaluated potential federal and state <br />funding resources for which MWMC might qual~. The SPd~ program was identified as the <br />only realistic alternative, but was determined to be less cost-effective than funding projects <br />through revenue bonds. MWMC would like to retain the option of accessing the SRF <br />program and has developed this comprehensive Facilities Plan to be eligible for SRF monies <br />ff that financing approach becomes more favorable than revenue bonds in the futvrre. <br /> <br />8.6 Recommended Financing Strategy <br /> <br />8.6.1 System Development Charges <br />A thorough revision of the SDC methodology was recently completed for the MWIvIC <br />regional wastewater system and was adopted by the Commission on April 1, 2004. The <br />methodology was developed/n accordance with Oregon SDC legislation (ORS 223.297- <br />223.314), and with the guidance of a CAC appointed by MWMC. The MWMC SDC <br />Methodology is based on a comb/ned reimbursement and improvement fee structure. In <br />order to calculate the improvement fee portion of the SDCs, it is necessary to allocate the <br />costs of capital projects as follows: <br /> <br /> Step 1: Allocate projects to facility process components (e.g., prima~ treatment, <br /> secondary treatment, etc.) <br /> <br /> Step 2: Allocate costs by components to system capacity parameters (e.g., average flow, <br /> peak flow, etc.) <br /> <br /> · Step 3: Allocate project costs to improvement type (capacity improvement, performance <br /> upgrade, or rehabilitation) <br /> <br /> ~ Step 4: Allocate costs to user type (existing customers or projected growth) <br /> <br /> These steps are applied to the $144 million 20-year project list (Alternat/ve 5 - Parallel <br /> Primary/Secondary Treatment). Steps 1 and 3 have to be developed on a case-by-case basis <br /> for the 20-year project list in question. Step 2 and 4 are inherent in the methodology and <br /> occur automatically once the allocations associated with Step 1 and 3 are determined. The <br /> basis for allocating projects in the proposed MWMC 20-year project list to the facility <br /> <br /> MWMC_8 0_REVS.DOC 8-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.