My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />process components (Step 1) and to an improvement type (Step 3) is discussed later in this <br />section and is summarized in Table 8.6.1-1 (located at the end of this chapter). Then, <br />combining Steps 1 and 3 with the allocations determined by the methodology (Steps 2 <br />and 4), the resulting breakdown between growth (SDCs) and exis~g user rates ~ presented <br />in Table 8.6.1-2 (located at the end of this chapter). In summary, approximately 40 percent <br />($57.8 million) of the 20-year project list is projected to be funded by SDCs, with the <br />remainLng 60 percent ($86.2 million) funded by user rates. <br /> <br />In Step 1 each future project is allocated to the following 12 facility components (Lqcluding <br />3 subcategories for biosolids): <br /> <br /> Collection system pipeline <br /> Collection system pump stations <br /> Prelirrfinary treahnent <br /> <br /> Primary treatment <br /> <br /> Secondary treatment <br /> Disinfection/ouffa~ <br /> <br /> Biosolids <br /> <br /> - General <br /> - Dewatering <br /> - Biocycle Farm <br /> <br /> Tertiary filters <br /> <br /> Reuse facilities <br /> <br /> Odor Control <br /> Peak flow management <br /> <br /> Support Facikities (Indirects) <br /> <br />These facility process components are defined in the SDC Methodology as adopted by <br />MWMC on April 1, 2004. <br /> <br />In addition, an allocation of the projects to project type is also presented. The three project <br />types are Capacity, Performance, and Rehabilitation, wb2ch are defined in the SDC <br />Methodology. The majority of the projects are allocated to one project type; however, some <br />projects will be split between capacity and performance types. Projects that have identical <br />allocations and basis for allocations may be grouped together. The basis for allocating <br />projects in the proposed MWMC 20-year project list to the facility process components <br />(Step 1) and to an improvement type (Step 3) is discussed in the following paragraphs. <br /> <br /> 8-8 MW~C_80_REV5 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.