My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />Project Type Allocation <br />Effluent reuse takes WPCF effluent out of the Willamette River. Potent-ia1 end uses include <br />irrigation of landscaping and agricultural lands. Development of reuse will help MW-MC <br />comply with existing and future thermal load limits, which may become more stringent. <br />Reuse will also assist with future compliance with mass load limits. As reuse is expanded <br />and effluent is used for irrigation or other uses instead of discharged to the Willamette <br />River, capacity is essentially freed up for new users. Effluent reuse benefits both existing <br />users and growth proportionate to their average flow contribution and is therefore allocated <br />to Performance. <br /> <br />8.6.7 Other Projects <br /> <br />Temporary Construction t~anagement, Facility Plan Update Projects, Wet Weather F~ow <br />Management PLan Update, and Support Development of Private Lateral Program <br />Facility Component Allocation <br />These projects serve MWMC's overall efforts and are allocated to Support Fac~ties. <br /> <br />Project Type Allocation <br />These projects identify long-term planning approaches and/or enable MWMC to continue <br />to operate the facilities in a manner that complies with local, state, and federal guidelines. It <br />is assumed that these projects benefit both exis 'ting and the growth increment equally and <br />are therefore allocated to Performance. <br /> <br />Mixing Zone Study Update <br />Facility Component Allocation <br />The purpose of this study is to determine the characteristics of the mixing zone of the outfall <br />to the Willamette Pdver and is therefore allocated to the Disinfectton/Outfall facility <br />component. <br /> <br />For the same rationale as the other study projects, this project is allocated to Performance. <br /> <br />8.6.8 Monthly Sewer Rates <br />Assun4ng that the $144 million Alternative 5 is implemented, three rate scenarios were <br />developed for the next 10 years. All three scenarios assume the approximate 40/60 split for <br />funding the 20-year project List between SDCs and user rates so that roughly $86.2 million of <br />the $144 million would be funded by rates. The rate scenario evaluation demonstrated that <br />MWMC has various options available to phase in increased rates to provide revenue <br />adequacy. <br /> <br /> 8.6.9 impact of Implementing Alternative 4 <br />If DEQ does not approve Alternative 5 - Parallel Primary/Secondary Treatment <br /> ($144 million), and Alternative 4 - High-Rate Clarification ($157 million) is implemented <br /> instead, an additional $13 mJllion will have to be spent on capital investments. The <br /> allocation between growth impact fees (SDCs) and existing users (user rates) for this <br /> additional expenditure w~ be identical to the allocation for the Parallel Primary/Secondary <br /> Treatment project in the 20-year project list. Based on Table 8.6.1-2, 29 percent of this <br /> <br /> 8-t4 MWMC_8 0_REV5 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.