My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t, [NTRODUCllON, PURPOSE AND NEED <br /> <br />T~BLE 1 <br />Public Meeting Summary <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Date Discussion Topics <br /> <br />November 24,2003 Briefing to the Commissioners and the genera~ public <br /> <br />January 8, 2004 20-year project list presented to commissioners, obtained direction on effluent <br /> reuse (thermal loading) and odor control issues <br /> <br />Mamh 3, 2004 Briefing to the general public <br /> <br />1.9 Facilities Plan Organization and Content <br />The organizatior~ of [his report is based primarily on the facilities plan outl~e provided L~ <br />AppendL~ C of the Guidelines for the Preparation of Facilities Plans and Environmental Reports for <br />Community Wastewater Projects (DEQ, 1999). <br /> <br />Some of the components reqrrLred by the DEQ facilities plan guidelir~es are addressed tn ~e <br />previous planning documents entitled Metropolitan Wastewater Management Commission <br />Master Plan for the Eugene-Springfield Water Pollution Control Facility (CI-I2M HILL, <br />1997), Wet Weather Flow Management Plar~ (CI-I2M HILL, 2001), and Biosolids <br />Management Plan (CI-I2M HILL, 1997). <br /> <br />DtLdng the facilities plarming effort, the project team wrote technical memoranda and/or <br />developed summary tables to document and evaluate its f~d~gs. Form~g the foundation <br />for this report, the follow~g memoranda arid/or tables provide barther [rfformat~on about <br />specific topics: <br /> <br /> 1. Wet Weather Peak Flow Analysis Technical Memorandum <br /> <br />2. Preliminary Screening of Alternatives Technical Memorandum <br /> <br />3. Flow and Load Project~ons Technical Memorandum <br /> <br /> 4. Water Q~ality Analysis Techrdcal Memorandum <br /> <br /> 5. Pretrea~ent Alternatives Technical Memorandum <br /> <br /> 6. Primary Clar~er Capacity Analysis and Enhancements Technical Memorandum <br /> <br /> 7. Secondary Treatment Enhancements Technical Memorandum <br /> <br /> 8. Secondary ClarLfier Enhancements - Altemat~ve Analysis Tech~cal Memorandum <br /> <br /> 9. Peak Flow Management Alternatives Technical Memorar~dum <br /> <br /> 10. Disi~-rfecfion Alternatives Technical Memorandum <br /> <br /> ll. Odor Control AlternaQves Techrdcal Memorandum <br /> <br /> NIVt~C_i.O_REVI 3 DOC 141 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.