Laserfiche WebLink
MWMC FACII~IES PLAN <br /> <br />12. Plant Hydraulics Technical Memorandum <br /> <br />13. Reuse and Thermal Compliar~ce Technical Memorandum <br /> <br />14. Projected Flowstreams for Solids Processes and Capacity Analysis of Biosolids <br /> Treatment Processes and Facilities <br /> <br />15. Biosolids Management and Reuse Alternatives Analysis <br /> <br />This Facilities Plan is organized as follows: <br /> <br />Executive Summary: Summarizes the conclusions and recommendations of the ptarming <br />team, including a description of the preferred alternatives. <br /> <br />Chapter 1 Introduction, Purpose and Need: Discusses the purpose for this Facilities Plan <br />and what the needs are at the current facilities, describes previous planning efforts, and <br />includes the goals of the MWMC, particularly the public outreach component. <br /> <br />Chapter 2 Study Area Characteristics: Locates the study area, describes the physical and <br />socioeconomic environment, and discusses current land use regulations that apply to the <br />MWMC service area. <br /> <br />Chapter 3 Existing Wastewater Facilities: Describes the current facilities and their status, <br />and further describes the WPCF, including its history, design, operations, and unit <br />performance and deficiencies. <br /> <br /> Chapter 4 Wastewater Characteristics: Provides data on wastewater flows and loads to the <br /> plant, describes unit design £actors, and lists projected wastewater characteristics that will <br /> affect facilities planning. <br /> <br /> Chapter 5 Basis of Planning: Provides information on the basis for design and costing of the <br /> alternative(s), water quality impacts, and the design capacit~y and an analysis of Lhe current <br /> conveyance system and WPCF. <br /> <br /> Chapter 6 Development and Evaluation of Alternatives: Discusses the alternatives <br /> development process for the conveyance system, liquid stream treatment, disinfection, <br /> effluent disposal, and biosolids management. Synthesizes this information into three <br /> complete alternatives. <br /> <br /> Chapter 7 Recommended Plan: Discusses the recommended improvements, with a cost <br /> s,amma~ and implementation schedule. <br /> <br /> Chapter 8 Financial Strategy: Evaluates various options for funding sources, and includes a <br /> recommended rate structure and £mancing strategy for MWMC. <br /> <br /> Chapter 9 Environmental Report: Discusses the environmental ramifications for the various <br /> alternatives, and provides a preferred alternative for parallel primary/secondary treahnent. <br /> <br /> Chapter 10 References: Lists the references used to write this Facilities Plan. <br /> <br /> MWt~C_I,O_REVl 3 DOC <br /> <br /> <br />