My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20438
COE
>
City of Eugene
>
Ordinances
>
2009 No. 20426-20449
>
Ordinance No. 20438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:34:22 PM
Creation date
10/14/2009 9:26:41 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20438
Document_Title
Ordinance On Southbank Bike Viaduct (Metro Plan Amendment)
Adopted_Date
10/12/2009
Approved Date
10/13/2009
CMO_Effective_Date
11/13/2009
Signer
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding #52. TransPlan (2002) is Eugene - Springfield's local Transportation System Plan and is a <br />functional plan of the Metro Plan. TransPlan provides policies addressing transportation <br />facilities and policies for the Eugene- Springfield Metropolitan Area. <br />Finding #53. TransPlan contains project lists and maps showing needed transportation facilities in <br />the Metropolitan area. The Future Bikeway Project Map shows an off - street bike facility running <br />along the south bank of the Willamette River underneath the 1 -5 Bridge. This bikeway is <br />identified as project #851 South Bank Trail (A) with an estimated cost of $1,800,000 <br />(Jurisdiction: Springfield). The viaduct would then connect with the existing bike path on the <br />Eugene side of 1 -5, shown as an existing off - street bike facility on the TransPlan Financially - <br />Constrained Bikeway System Projects map. <br />Finding #54. TransPlan's TSI Bicycle Policy # 3 (Chapter 2, pg. 33) requires "bikeways to connect <br />new development with nearby neighborhood activity centers and major destinations." As <br />previously mentioned, the South Bank Viaduct and South Bank Path will connect Eugene to <br />Glenwood and to downtown Springfield through Glenwood. <br />Finding #55. TransPlan's TSI Bikeway Policy #4 assigns priority to the finding of "Priority Bikeway <br />Miles." These are defined as stand -alone bike projects listed in TransPlan that are not <br />associated with roadway projects. As mentioned above, the proposed South Bank Viaduct is <br />part of project #851 South Bank Trail (A) which is a stand -alone project that is not associated <br />with a roadway. <br />Finding #56. Central Lane MPO Regional Transportation Plan lists the Glenwood Riverfront Park <br />Path (Project 851) as a financially constrained project. It is classified as a multiuse path without <br />road project. <br />Finding #57. Additionally, Goal 12 is implemented through the Transportation Planning Rule <br />(TPR), as defined in Oregon Administrative Rule OAR 660 - 012 -0000, et seq. The Eugene - <br />Springfield Metropolitan Area Transportation Plan (TransPlan) provides the regional policy <br />framework through which the TPR is implemented at the local level. The TPR (OAR 660 -012- <br />0060) states that when land use changes, including amendments to acknowledged <br />comprehensive plans, significantly affect an existing or planned. transportation facility the local <br />government shall put in place measures to assure that the allowed land uses are consistent with <br />the identified function, capacity and performance standards (level of service, volume to capacity <br />ratio, etc.) of the facility. TransPlan, which implements Goal 12, identifies an off -site bike path <br />as a future facility and the south bank bike path on the Eugene side as an existing off - street bike <br />path. <br />Finding #58. The TPR requires a determination of which existing and planned transportation <br />facilities will experience a significant affect as a result of the proposed plan amendment, and <br />defines what constitutes a significant effect (OAR 660 - 012 - 0060(1)). The analysis for significant <br />effect is related to impacts to function, capacity and performance standards which are street <br />standards not applicable to bicycle /pedestrian paths; therefore the proposal is consistent with <br />TPR. Furthermore, the viaduct and path facilities provide alternative transportation modes <br />which would benefit, not worsen, nearby streets. <br />Attachment 1 -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.