My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20438
COE
>
City of Eugene
>
Ordinances
>
2009 No. 20426-20449
>
Ordinance No. 20438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:34:22 PM
Creation date
10/14/2009 9:26:41 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20438
Document_Title
Ordinance On Southbank Bike Viaduct (Metro Plan Amendment)
Adopted_Date
10/12/2009
Approved Date
10/13/2009
CMO_Effective_Date
11/13/2009
Signer
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding #65. The exception taken in 2003 and in 2008 (articulated in Chapter III, Policy D.11) did <br />not foresee or include the proposed South Bank Viaduct. <br />Finding #66. Chapter III -D of the Metro Plan specifically addresses issues related to the Willamette <br />Greenway. The following policies found in Chapter III -D are applicable to this proposal and are <br />cited below (emphasis added), and further addressed below under Criterion #2, consistency <br />with the Metro Plan. Policy D.11, restated below, is the policy that directs an exception to be <br />taken and a text amendment to the Metro Plan for the proposed viaduct and path, similar to the <br />exceptions provided for the 1 -5 bridges. <br />Policy D.2 Land Use regulation and acquisition programs along river corridors and waterways <br />shall take into account all the concerns and needs of the community, including recreation, <br />resource, and wildlife protection; enhancement of river corridor and waterway environments; <br />potential for supporting non - automobile transportation; opportunities for residential <br />development; and other compatible uses. <br />Policy D.3 Eugene, Springfield and Lane County shall continue to cooperate in expanding <br />water - related parks and other facilities, where appropriate, that allow access to and <br />enjoyment of the river and waterway corridors <br />Policy D.11 The taking of an exception shall be required if a non -water dependent <br />transportation facility requires placing of fill within the Willamette River Greenway setback. <br />An exception to Statewide Planning Goal 15 Willamette River Greenway was approved for <br />Oregon Department of Transportation (ODOT) for purposes of removing and replacing the <br />decommissioned 1 -5 bridge, the temporary detour bridge and the Canoe Canal bridge with two <br />new parallel bridges (one southbound and one northbound) within the 1 -5 right -of -way crossing <br />the Willamette River and Canoe Canal and within the Willamette River Greenway Setback Line. <br />The exception authorizes construction and later removal of one or more temporary work <br />bridges; demolition of the decommissioned 1 -5 Willamette River Bridge, Canoe Canal Bridge, and <br />detour bridges; construction of the two replacement bridges; reconstruction of the roadway <br />approaches to the bridges (1 -5 and ramps); rehabilitation of the project area; and completion of <br />any required mitigation of project impacts. In association with these tasks, the exception <br />further authorizes within the Willamette River Greenway Setback Line the addition and removal <br />of fill within ODOT right -of -way and the removal of fill within a temporary slope easement east <br />of 1 -5. This exception satisfies the criteria of Oregon Administrative Rule (OAR) 660 - 004 - 0022(6), <br />Willamette Greenway, and the exception requirements of OAR 660 - 004 -0020 Goal 2 Part 11(c) <br />for a "reasons" exception, and pursuant to OAR 660- 004 -0015, is hereby adopted as an <br />amendment to the Metro Plan text, Policy D.11, Chapter III, Section D <br />Goals 16 through 19 — Estuarine Resources, Coastal Shorelands, Beaches and Dunes, and Ocean <br />Resources. <br />Finding #67. There are no coastal, ocean, estuarine, or beach and dune resources within the <br />Eugene - Springfield Urban Growth Boundary. These goals do not apply to this proposal. <br />Attachment 1 -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.