My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20438
COE
>
City of Eugene
>
Ordinances
>
2009 No. 20426-20449
>
Ordinance No. 20438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:34:22 PM
Creation date
10/14/2009 9:26:41 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20438
Document_Title
Ordinance On Southbank Bike Viaduct (Metro Plan Amendment)
Adopted_Date
10/12/2009
Approved Date
10/13/2009
CMO_Effective_Date
11/13/2009
Signer
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conclusion <br />The findings shown above demonstrate that the proposed Metro Plan text amendments and Goal 15 <br />exception allowing the construction of the South Bank Viaduct facility as part of the South Bank Path is <br />in substantial conformance to Oregon's Statewide Planning Goals. <br />Criterion #2. "Adoption of the amendment must not make the Metro Plan internally <br />inconsistent." <br />Findings <br />Finding #68. Chapter III -D of the Metro Plan specifically addresses issues related to the Willamette <br />Greenway. The following policies found in Chapter III -D are cited below (emphasis added). <br />Policy D.2 Land Use regulation and acquisition programs along river corridors and waterways <br />shall take into account all the concerns and needs of the community, including recreation, <br />resource, and wildlife protection; enhancement of river corridor and waterway environments; <br />potential for supporting non - automobile transportation opportunities for residential <br />development; and other compatible uses. <br />Policy D.3 Eugene, Springfield and Lane County shall continue to cooperate in expanding <br />water - related parks and other facilities where appropriate, that allow access to and <br />enjoyment of the river and waterway corridors <br />Policy D.11 The taking of an exception shall be required if a non -water dependent <br />transportation facility requires placing of fill within the Willamette River Greenway setback. <br />An exception to Statewide Planning Goal 15 Willamette River Greenway was approved for <br />Oregon Department of Transportation (ODOT) for purposes of removing and replacing the <br />decommissioned 1 -5 bridge, the temporary detour bridge and the Canoe Canal bridge with two <br />new parallel bridges (one southbound and one northbound) within the I -5 right -of -way crossing <br />the Willamette River and Canoe Canal and within the Willamette River Greenway Setback Line. <br />The exception authorizes construction and later removal of one or more temporary work <br />bridges; demolition of the decommissioned 1 -5 Willamette River Bridge, Canoe Canal <br />Bridge, and detour bridges; construction of the two replacement bridges; reconstruction of the <br />roadway approaches to the bridges (1 -5 and ramps); rehabilitation of the project area; and <br />completion of any required mitigation of project impacts. In association with these tasks, the <br />exception further authorizes within the Willamette River Greenway Setback Line the addition <br />and removal of fill within ODOT right -of -way and the removal of fill within a temporary slope <br />easement east of 1 -5. This exception satisfies the criteria of Oregon Administrative Rule (OAR) <br />660 - 004 - 0022(6), Willamette Greenway, and the exception requirements of OAR 660- 004 -0020 <br />Goal 2 Part II(c) for a "reasons" exception, and pursuant to OAR 660 -004 -0015, is hereby <br />adopted as an amendment to the Metro Plan text, Policy D.11, Chapter 111, Section D. <br />Finding #69. The proposed South Bank Viaduct is located within the Willamette River Greenway <br />setback. While the viaduct design is not complete, it may require the removal or placement of <br />Attachment 1 -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.