My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 6: Ordinance on TransPlan and Metro Plan Text Amendments
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 11/09/09 Meeting
>
Item 6: Ordinance on TransPlan and Metro Plan Text Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:54:19 PM
Creation date
11/5/2009 2:17:46 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> <br />3of 4 <br /> <br /> <br />Table 1b-Future (Beyond 20-Years) <br /> <br />Capital Investment Actions: Roadway Projects <br /> <br /> <br /> <br />Geographic Estimated <br /> <br /> <br />NameLimitsDescriptionJurisdictionCostLengthNumber <br /> <br />Project Category:New Arterial Link or Interchange <br /> <br /> <br />Status:Future <br /> <br /> <br />Eugene-Springfieldat Main StreetConstruct interchangeODOT$9,000,000027 <br /> <br /> Highway (SR-126) <br /> <br /> <br />Eugene-Springfieldat 52nd StreetConstruct interchangeODOT $9,000,000030 <br /> <br /> Highway (SR-126) <br /> <br />Beltline HighwayWest 11th Avenue to Continue widening to 4 ODOT$17,000,0001.14312 <br /> <br /> <br />Roosevelt Boulevardlanes; new RR Xing, <br /> <br /> <br />interchange @ WEP, grade <br /> <br /> <br />separation @ Roosevelt and <br /> <br /> <br /> turn lanes on West 11th <br /> <br /> <br />Ave (ODOT: West 11th <br /> <br /> <br />North City Limits Stage 3) <br /> <br />Project Category:Added Freeway Lanes or Major <br /> <br /> <br />Interchange Improvements <br /> <br /> <br />Status:Future <br /> <br /> <br /> I-530th Avenue/McVay Interchange reconstruction ODOT$15,000,000257 <br /> <br /> <br />Highwayto improve operations and <br /> <br /> <br />safety, reconstruct ramps <br /> <br /> <br />and bridges to modern <br /> <br /> <br />standards, and provide for 6 <br /> <br /> lanes on I-5. <br /> <br />I-105Washington/Jefferson Add lane to NB on-ramp ODOT$5,805,0000.75154 <br /> <br /> <br />Street Bridgefrom 6th Ave, extend third <br /> <br /> <br />NB lane over bridge to Delta <br /> <br /> <br />Highway exit ramp <br /> <br /> <br />Eugene- I-5 to Mohawk BoulevardWiden to 6 lanesODOT$20,124,0002.6 728 <br /> <br />Springfield <br /> <br />Highway (SR-126) <br /> <br />Eugene-SpringfieldPioneer Parkway/Q StreetInterchange improvementsODOT$15,000,0000727 <br /> <br /> Highway (SR-126) <br /> <br />I-105Delta Highway to Coburg Widen to 6 lanesODOT$9,210,6001.19647 <br /> <br /> <br />Road <br /> <br />I-105Coburg Road to I-5Widen to 6 lanesODOT$11,842,2001.53648 <br />
The URL can be used to link to this page
Your browser does not support the video tag.