Laserfiche WebLink
Exhibit A <br /> <br />4of 4 <br /> <br /> <br />Geographic Estimated <br /> <br /> <br />NameLimitsDescriptionJurisdictionCostLengthNumber <br /> <br />I-5I-105 to Highway 58 Widen remaining sections to ODOT$35,000,0005.66260 <br /> <br /> <br />(Goshen)6 lanes <br /> <br />I-5@ Glenwood InterchangeReconfigure interchange, ODOT$10,000,000256 <br /> <br /> <br />address weaving, provide 6 <br /> <br /> <br /> lanes on freeway <br /> <br /> I-5 @ Willamette Interchange reconstruction ODOT$25,000,000150 <br /> <br /> <br />River/Franklin Boulevard to create one full <br /> <br /> <br />Interchangeinterchange to improve <br /> <br /> <br />operations and safety, <br /> <br /> <br />reconstruct ramps and <br /> <br /> <br />bridges to modern <br /> <br />standards, and provide for 6 <br /> <br />lanes on I-5 <br /> <br />th <br />I-105Washington/Jefferson Add lane to 6 Ave. off-rampODOT$4,300,0000.25151 <br /> <br />Street Bridge <br /> <br />Project Category:Arterial Capacity Improvements <br /> <br /> <br />Status:Future <br /> <br /> <br />Project Category:Urban Standards <br /> <br /> <br />Status:Future <br /> <br /> <br /> <br />Highway 99Roosevelt Boulevard to Upgrade to urban facilityODOT$4,955,5001.14148 <br /> <br /> <br />Garfield Street <br /> <br />McVay HighwayI-5 to Franklin BoulevardUpgrade to 3-lane urban ODOT$6,500,0001.5833 <br /> <br /> <br />facility; intersection <br /> <br /> <br />improvements at I-5 and <br /> <br /> <br />Franklin Boulevard <br /> <br />Jasper RoadS. 42nd Street to Jasper Upgrade to 2 to 3-lane urbanODOT$5,250,0003.560 <br /> <br /> <br />Road Extension facility; intersection <br /> <br /> <br />improvement at 42nd Street <br /> <br />and Jasper Road <br /> <br />Franklin Blvd. Jenkins Drive to Mill St. Upgrade to urban facility Springfield/ODOT $5,000,000 1.2 839 <br /> <br />