Item 2: Resolution Amending MWMC Regional Wastewater SDC Methodology
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 11/16/09 Public Hearing
>
Item 2: Resolution Amending MWMC Regional Wastewater SDC Methodology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:22:51 PM
Creation date
11/13/2009 11:02:22 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I-1.Allocate project costs to facility process components (e.g., primary treatment, secondary <br /> <br />treatment). <br />I-2.Allocate costs by components to system capacity parameters (e.g., average flow, peak <br /> <br />flow). <br />I-3.Allocate project costs to type (capacity improvement, performance upgrade, or <br /> <br />rehabilitation). <br />I-4.Allocate costs to user type (existing customers or projected growth). <br /> <br /> <br />The project cost allocation methodology provides an equitable basis for determining the <br />projects or portions of projects that are related to growth capacity needs and are, thereby, <br />included in the improvement fee portion of the SDC calculation. The methodology is not <br />tied to a specific list of projects intended to be funded by SDCs (20-year project list), but is <br />intended to provide a consistent framework for allocation of future projects to growth. <br />Each step of the methodology is described below. The general allocation process is also <br />presented graphically in Figure 3. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />FIGURE 3—PROJECT COST ALLCOATION <br /> <br />Page 13 OF 39 <br /> <br /> <br /> <br />