standards (i.e., projects that provide the next capacity increment within the planning <br />period). <br />2.—Projects that increase system capacity by increasing the <br />Performance Improvements <br /> <br />level of performance provided by facilities. Unlike ‘capacity’ projects that relate only to <br />the next increment of capacity, performance upgrades are generally sized based on total <br />projected capacity needs at the end of the planning period (existing and future). <br />3.—Projects designed to remedy an existing system deficiency and do not <br />Rehabilitation <br /> <br />enhance system capacity. <br />Capacity and performance upgrade projects can be new facilities, or upgrade/expansion of <br />existing facilities. Rehabilitation projects are the replacement of outdated or worn out <br />equipment or facilities. <br />The majority of the projects will typically fall completely into one project type. However, <br />some projects may be split between capacity and performance types. The general criteria for <br />allocating projects to the above categories are shown in Table 5. These criteria should be <br />applied in the development of specific projects for inclusion in the appropriate planning <br />document or project list and should be considered and evaluated as part of the process of <br />adoption of such a plan or project list. <br />TABLE 5 <br />Summary of Project Type Allocation Criteria <br />Project Type Potential Criteria <br />Capacity Adds new facilities/expands existing facilities <br />Provides new liquids treatment or biosolids capacity beyond existing <br />system design standard or beyond the current permitted capacity <br />Performance Improvements Adds new facilities/improves existing facilities <br />Provides capacity/enhanced capability sized for total future capacity <br />needs <br />Driven by new regulatory requirement <br />Driven by increase in community performance standard <br />Technological efficiencies <br />Rehabilitation Replaces existing facility or portion of facility <br />Does not serve growth either through existing available or new <br />capacity <br />Preserves existing facility performance/capacity <br /> <br />Once project costs have been allocated to system component and project type categories, <br />and the costs have been distributed to the system capacity parameters, the final step in the <br />project cost allocation process is to assign costs to user types. For the purposes of the SDC <br />methodology, there are two user types: 1) existing customers, and 2) new customers or <br />growth. Costs that are allocated to growth are incorporated into the SDC improvement fee <br />calculation. Costs allocated to existing customers must be paid through some other funding <br />sources (e.g., existing reserves or future user rates). <br />Page 15 OF 39 <br /> <br /> <br /> <br />