My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2: Resolution Amending MWMC Regional Wastewater SDC Methodology
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 11/16/09 Public Hearing
>
Item 2: Resolution Amending MWMC Regional Wastewater SDC Methodology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:22:51 PM
Creation date
11/13/2009 11:02:22 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Past Payments <br />A portion of MWMC’s existing facility costs were funded through general obligation (GO) <br />bonds. The debt service on the bonds was retired through property taxes. Undeveloped land <br />in the cities of Eugene and Springfield was subject to property taxes, and therefore a GO <br />bond credit is included in the methodology. The credit is equal to the present value of past <br />payments on bond principal, expressed in dollars per $1,000 of assessed valuation. The <br />credit shall accrue from the year of annexation, and be based upon the assessed value of the <br />real property at the time of application for connection to the system. <br />Appendix E shows the calculation of the GO bond credit. <br />Future Payments <br />At the time of adoption of the project list upon which SDCs are to be based, or any periodic <br />modification to such list, a credit against the SDCs will be calculated. The credit will reflect <br />the present value of future contributions (through user fees) by new development to the <br />repayment of debt service for the cost of capital improvements that benefit existing <br />customers.. The credit analysis is structured as follows: <br />1.Debt services costs attributable to projects on the SDC project list are allocated between <br /> <br />growth and existing users, based on the projects funded with the debt proceeds. <br />2.Future user fee billing units (average flow and pounds of BOD and TSS) are estimated <br /> <br />for each year of the planning period based on system planning criteria <br />3.The annual user rate supported debt service per billing unit is determined by dividing <br /> <br />the existing users’ share of debt service payable each year from user fees (from Step 1) <br />by the annual billing units estimated for each year (from Step 2), over the life of the debt. <br />4.The present value of the future stream of rate payments is determined for each year of <br /> <br />the planning period to determine the credit amount per unit of capacity. <br />Page 18 OF 39 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.