Laserfiche WebLink
Methodology Element Five: Periodic modification of existing sytem and future <br />project values <br />The value of existing available capacity and future available capacity may be adjusted from <br />time to time as stated in Methodology Element Two: Step One and Step Three. <br />Methodology Element Six: Compliance Charge <br />A charge is included for the costs of complying with the provisions of ORS 223.297 to <br />223.314, including: <br />? <br />Legal costs (both litigation costs and annual routine legal fees) <br /> <br />? <br />Annual Accounting/auditing costs <br /> <br />? <br />Annual reporting costs <br /> <br />? <br />SDC methodology development costs <br /> <br /> <br />In developing the compliance charge, the total costs associated with SDC compliance <br />activities are projected for the planning period. The costs are then attributed to the capacity <br />parameters in proportion to the combined reimbursement and improvement costs. As with <br />the improvement and reimbursement fees, the costs by parameter are then divided by the <br />number of growth units projected for the planning period in order to determine a <br />compliance cost per unit of capacity. <br />Page 19 OF 39 <br /> <br /> <br /> <br />