My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4992
COE
>
City of Eugene
>
Resolutions
>
2009 No. 4960-4995
>
Resolution No. 4992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:51:10 PM
Creation date
11/30/2009 2:49:51 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
11/23/2009
Document_Number
4992
CMO_Effective_Date
11/23/2009
Author
Beth Forrest
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Winter Storm # 4 <br />Proposed Action Item: <br />Alignment with Plan Goals: <br />Goal 2, 4 <br />Consider upgrading lines and poles to improve wind/ice loading, <br />undergrounding critical lines, and adding interconnect switches to <br />allow alternative feed paths and disconnect switches to minimize <br />outage areas. <br />Rationale for Proposed Action Item: <br />High winds and ice during winter storms can topple trees and break limbs which in turn can result in <br />power outages and disrupt telephone, computer, and TV and radio service. In addition, ice from winter <br />storms can accumulate on power lines, causing lines and poles to break. While the Eugene Water and <br />Electric Board (EWEB) and the Springfield Utility Board (SUB) construct them to meet certain loading <br />standards, some lines and poles should be upgraded to improve wind and ice loading, critical lines should <br />be undergrounded, interconnect switches should be installed in areas to allow alternative feed paths, and <br />disconnect switches should be installed to minimize outage areas. Each of these efforts would <br />significantly improve service in the Eugene/Springfield metro area and protect power infrastructure from <br />winter storms. <br />The Disaster Mitigation Act of 2000 requires communities to identify mitigation actions that address new <br />and existing buildings and infrastructure [201.6(c)(3)(ii)]. Improving power infrastructure by upgrading <br />lines and poles to improve wind/ice loading, undergrounding critical lines, adding interconnect switches to <br />allow alternative feed paths, and disconnecting switches to minimize outage areas will all help to improve <br />electrical service in the Eugene/Springfield metro area and protect this critical infrastructure from winter <br />storms. <br />Ideas for Implementation: <br />Identify areas that are subject to frequent power outages and develop appropriate solutions to reduce the <br />likelihood of a power outage. <br />Seek funding for specific areas subject to frequent power outages from winter storms. For a list of funding <br />resources, see the Resources Appendix in this mitigation plan. <br />Coordinating Organization: Eugene Water and Electric Board (EWEB), Springfield Utility <br />Board (SUB) <br />Internal Partners: External Partners: <br />Eugene/Springfield Public Works OEM, FEMA <br />Timeline:If available, estimated cost: <br />Short Term ()Long Term (2-4 or more years) <br />0-2 years <br />Ongoing <br />Form Submitted by: Eugene and Springfield Steering Committees <br />Action Item Status: Continued from 2004 plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.