Laserfiche WebLink
Winter Storm # 4 <br />Proposed Action Item: <br />Alignment with Plan Goals: <br />Goal 2, 4 <br />Consider upgrading lines and poles to improve wind/ice loading, <br />undergrounding critical lines, and adding interconnect switches to <br />allow alternative feed paths and disconnect switches to minimize <br />outage areas. <br />Rationale for Proposed Action Item: <br />High winds and ice during winter storms can topple trees and break limbs which in turn can result in <br />power outages and disrupt telephone, computer, and TV and radio service. In addition, ice from winter <br />storms can accumulate on power lines, causing lines and poles to break. While the Eugene Water and <br />Electric Board (EWEB) and the Springfield Utility Board (SUB) construct them to meet certain loading <br />standards, some lines and poles should be upgraded to improve wind and ice loading, critical lines should <br />be undergrounded, interconnect switches should be installed in areas to allow alternative feed paths, and <br />disconnect switches should be installed to minimize outage areas. Each of these efforts would <br />significantly improve service in the Eugene/Springfield metro area and protect power infrastructure from <br />winter storms. <br />The Disaster Mitigation Act of 2000 requires communities to identify mitigation actions that address new <br />and existing buildings and infrastructure [201.6(c)(3)(ii)]. Improving power infrastructure by upgrading <br />lines and poles to improve wind/ice loading, undergrounding critical lines, adding interconnect switches to <br />allow alternative feed paths, and disconnecting switches to minimize outage areas will all help to improve <br />electrical service in the Eugene/Springfield metro area and protect this critical infrastructure from winter <br />storms. <br />Ideas for Implementation: <br />Identify areas that are subject to frequent power outages and develop appropriate solutions to reduce the <br />likelihood of a power outage. <br />Seek funding for specific areas subject to frequent power outages from winter storms. For a list of funding <br />resources, see the Resources Appendix in this mitigation plan. <br />Coordinating Organization: Eugene Water and Electric Board (EWEB), Springfield Utility <br />Board (SUB) <br />Internal Partners: External Partners: <br />Eugene/Springfield Public Works OEM, FEMA <br />Timeline:If available, estimated cost: <br />Short Term ()Long Term (2-4 or more years) <br />0-2 years <br />Ongoing <br />Form Submitted by: Eugene and Springfield Steering Committees <br />Action Item Status: Continued from 2004 plan. <br />