My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: ODOT/Beltline Highway - River Road to Coburg Road
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 04/14/10 Work Session
>
Item A: ODOT/Beltline Highway - River Road to Coburg Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:04:04 PM
Creation date
4/9/2010 11:11:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELTLINE FACILITY PLAN PHASE II: RIVER ROAD TO COBURG ROAD: CONCEPT EVALUATION PROCESS <br />Safety <br />Ю±ª·¼» ¿ ¬®¿²°±®¬¿¬·±² ²»¬©±®µ ¬¸¿¬ ¸¿ ¬¸» °±¬»²¬·¿´ ¬± ·²½®»¿» ¿º»¬§ º±® ¿´´ ³±¼»ò <br />Objectives: <br />׳°®±ª» Þ»´¬´·²» Ø·¹¸©¿§ ¿²¼ ·²¬»®½¸¿²¹» ¿®»¿ ·² ¬¸» ¬«¼§ ¿®»¿ ¬± ·²½®»¿» ¿º»¬§ <br />º±® «»® ¿²¼ ®»¼«½» ½®¿¸ º®»¯«»²½§ ¿²¼ »ª»®·¬§ô ¬¸»®»¾§ ·³°®±ª·²¹ ®»´·¿¾·´·¬§ <br />ݱ²·¼»® ¬¸» ²»»¼ ±º »³»®¹»²½§ ®»°±²» ª»¸·½´» <br />Measures: <br />д¿½» ·² ¬¸» ¬«¼§ ¿®»¿ ©¸»®» ¬¸» Þ»´¬´·²» Ø·¹¸©¿§ ±® ·²¬»®½¸¿²¹» ª·±´¿¬» µ²±©² <br />»²¹·²»»®·²¹ ¾»¬ °®¿½¬·½» ±® ¼»·¹² ¹«·¼»´·²» ¿ ®»´¿¬»¼ ¬± ¿º»¬§ <br />λ¼«½» ½±²º´·½¬ °±·²¬ º±® ³±¬±®·¬ ¿²¼ ¾»¬©»»² ³±¬±®·¬ ¿²¼ ¾·½§½´·¬ ±® <br />°»¼»¬®·¿² <br />Ю±ª·¼» §¬»³ ®»¼«²¼¿²½§ ¿²¼ñ±® »²¸¿²½»¼ ³±¾·´·¬§ º±® »³»®¹»²½§ ®»°±²» <br />®±«¬» ¿²¼ ª»¸·½´» <br /> <br />Measure Rating <br />Places in the study area Improvement to geometric deficiencies in multiple areas and <br />where the Beltline Highway movements <br />or interchanges violate <br /> Some improvement to geometric deficiencies <br />known engineering best <br />practices or design <br /> Does not address geometric deficiencies <br />guidelines <br /> Worsens geometric deficiencies <br />Conflict points for bicyclists Not applicable at this level of design. Further design may limit or <br />and pedestrians with decrease conflict points for bicyclists and pedestrians with <br />motorists motorists. <br />Conflict points between Separates weaving, merging and diverging movements <br />motorists on Beltline <br />Removes weaving conflicts between Delta Highway loop <br />Highway <br />ramp(s) <br /> No change <br /> Increase conflict points <br />System redundancy and/or New river crossing for use in event of bridge closure or <br />enhanced mobility for updated Willamette River Bridges with auxiliary lanes or C/D <br />emergency response routes roads <br />and vehicles <br />No new river crossing capacity, but Beltline mainline capacity <br />is added, enhancing emergency vehicle mobility <br /> No new river crossing capacity <br /> N/A <br /> <br />CONCEPT EVALUATION PROCESS_FEB23.DOC <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.