My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: ODOT/Beltline Highway - River Road to Coburg Road
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 04/14/10 Work Session
>
Item A: ODOT/Beltline Highway - River Road to Coburg Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:04:04 PM
Creation date
4/9/2010 11:11:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELTLINE FACILITY PLAN PHASE II: RIVER ROAD TO COBURG ROAD: CONCEPT EVALUATION PROCESS <br />Ì®¿ºº·½ ±°»®¿¬·±² º±® ¬«¼§ ¿®»¿ ®¿³° ¿²¼ ®¿³° ¬»®³·²¿´ ·²¬»®½¸¿²¹»ô ¿ <br />»ª¿´«¿¬»¼ ¾¿»¼ ±² ®¿³° °¿½·²¹ ¿²¼ñ±® »´·³·²¿¬·²¹ ±® ·³°®±ª·²¹ ³»®¹»ô ¼·ª»®¹»ô <br />¿²¼ ©»¿ª·²¹ ³¿²»«ª»® ®»´¿¬·ª» ¬± ¬¸» Þ»´¬´·²» Ø·¹¸©¿§ <br />Ì®·° ´»²¹¬¸ ¿²¼ ¬®¿ª»´ ¬·³» ¾»¬©»»² µ»§ ±®·¹·² ¿²¼ ¼»¬·²¿¬·±² º±® ¿´´ ³±¼» ·² ¬¸» <br />¬«¼§ ¿®»¿ <br />׳°®±ª» ´±½¿´ ½±²²»½¬·ª·¬§ º±® ¿´´ ³±¼» <br /> <br />Measure Rating <br />Demand to capacity (D/C) D/C under 1.0 <br />on the Beltline Highway <br /> D/C between 1.0-1.4 (better than no build) <br />mainline (Evaluated at the <br />Willamette River bridge) <br /> No change in D/C from no build (~1.4) <br /> D/C above 1.4 (Worse than no build) <br />Merge/diverge operations Merge/diverge is removed from the mainline <br />on the ramps/interchanges <br /> Ramps/interchange operations generally are improved <br />(increased spacing and/or improved geometry), but still <br />merging/diverging on the mainline <br /> No change from no build <br /> Ramps/interchanges are worse than the no build <br />Trip Length and Travel Time Reduced travel times and/or trip lengths for all types of trips <br />using the Beltline Highway <br /> Some improvements to trip time and travel length for specific <br />O/D pairs, such as local trips between Green Acres and Santa <br />Clara <br />No measurable change to system wide trip time and travel <br />length <br /> N/A <br />Connectivity for all modes New multimodal facilities <br />New Highway connectivity – with ability to add an adjacent <br />pedestrian and bicycle facility if the Willamette River Bridges <br />are updated <br /> No new local connectivity <br /> Worse connectivity than no build <br /> <br />CONCEPT EVALUATION PROCESS_FEB23.DOC <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.