Laserfiche WebLink
BELTLINE FACILITY PLAN PHASE II: RIVER ROAD TO COBURG ROAD: CONCEPT EVALUATION PROCESS <br />Measure Rating <br />1 <br /> N/A <br />Ability to be phased <br /> Project that can be phased <br /> One phase project that is lower cost <br /> High cost that cannot be phased <br />Construction cost Low – No new bridge structures required <br />Medium – Some new bridge structures <br />High – Major roadway/interchange reconstruction with new bridge <br />structures <br />Operation and maintenance Cannot be evaluated at this time <br />cost <br />Concept Evaluation <br /≯» º±´´±©·²¹ ¬¿¾´» ­¸±©­ ¸±© »¿½¸ ±º ¬¸» ¿´¬»®²¿¬·ª»­ ©»®» »ª¿´«¿¬»¼ ¾¿­»¼ ±² ¬¸» <br />¿¾±ª» ³»¿­«®»­ò <br />1 <br /> Phasing, by definition requires that each phase provides benefit and independent utility. <br />CONCEPT EVALUATION PROCESS_FEB23.DOC <br />12 <br />