My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: ODOT/Beltline Highway - River Road to Coburg Road
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 04/14/10 Work Session
>
Item A: ODOT/Beltline Highway - River Road to Coburg Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:04:04 PM
Creation date
4/9/2010 11:11:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
View images
View plain text
BELTLINE FACILITY PLAN PHASE II: RIVER ROAD TO COBURG ROAD: CONCEPT EVALUATION PROCESS <br />Measure Rating <br />1 <br /> N/A <br />Ability to be phased <br /> Project that can be phased <br /> One phase project that is lower cost <br /> High cost that cannot be phased <br />Construction cost Low – No new bridge structures required <br />Medium – Some new bridge structures <br />High – Major roadway/interchange reconstruction with new bridge <br />structures <br />Operation and maintenance Cannot be evaluated at this time <br />cost <br />Concept Evaluation <br /≯» º±´´±©·²¹ ¬¿¾´» ¸±© ¸±© »¿½¸ ±º ¬¸» ¿´¬»®²¿¬·ª» ©»®» »ª¿´«¿¬»¼ ¾¿»¼ ±² ¬¸» <br />¿¾±ª» ³»¿«®»ò <br />1 <br /> Phasing, by definition requires that each phase provides benefit and independent utility. <br />CONCEPT EVALUATION PROCESS_FEB23.DOC <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).