My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Springfield BudgetDetail <br />SIGNIFICANT CHANGES FOR FY 10-11 <br />The budget for Springfield Personnel Services, Materials and Services, and Capital Outlay for FY <br />10-11 totals $3,546,832 representing an overall decrease of $328,200 over the adopted FY 09-10 <br />budget (8.5%). <br />Personnel Services <br />Personnel Services totaling $1,586,955 represent a FY 10-11 decrease of $224,733 or (12.4%) <br />over the originally adopted FY 09-10 budget. <br />Staffing <br />A net decrease of 2.95 FTE is included in the FY 10-11 budget. <br />-1.0 Eliminated a Design Construction Coordinator position. <br />-1.0 Eliminated a Civil Engineer position. <br />-0.95 Re-allocation of two Engineering Assistants and a Clerk II position across other <br />programs. <br />Regular Wages - $1,043,086 [Decrease of $152,510 or (13%)] <br />This decrease represents net decrease of 2.95 FTE <br />Employee Benefits - Budget Request $471,503 [Decrease $87,480 or 16%] <br />Fringe benefits are reduced by $87,480, primarily as a result of the reduction in FTEs. <br />Materials and Services <br />The Materials and Services budget represents a total FY 10-11 decrease of $103,467 or (5.0%) <br />over the originally adopted FY 09-10 budget.The major changes are in the following budget <br />categories: <br />Contractual Services –$258,500 [Increase of $50,000 or (24%)] <br />Increase in Contractual Services of $50,000 to perform condition assessment of the Regional <br />Wastewater conveyance system. <br />Page 26 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.