My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Eugene Budget Detail <br />Continue to evaluate impacts of regulatory actions (such as the federal SSO and blending <br />policy development, Willamette River TMDLs implementation, and any newly adopted state <br />water quality standards) upon operational responsibilities. <br />Complete scheduled major rehabilitation and equipment replacement projects in an efficient <br />and timely manner. <br />Complete major steps in the effective use of the maintenance management program, <br />including updating of the computerized maintenance management system for maintenance <br />scheduling, asset information, reporting, and monitoring performance. <br />SIGNIFICANT CHANGES IN THE O & M BUDGET FOR FY 10-11 <br />The proposed budget for Operations and Maintenance of the regional wastewater treatment facilities <br />. <br />(personnel, materials and services, and capital outlay) for FY 10-11 totals $11,612,107 The amount <br />represents an increase of 2.1% from the FY 09-10 budget. The largest cost centers for the proposed <br />budget are personnel costs, utilities, chemicals, and fleet operating charges. Details of significant <br />items and changes proposed for the FY 10-11 Operations and Maintenance budget as compared to <br />the FY 09-10 budget are highlighted below: <br />Personnel Services <br />Personnel Services totaling $7,022,125 represents a FY 10-11 increase of $173,181 or 2.5%. The major <br />changes are in the following budget categories: <br />Staffing <br />A budget decrease of -0.38 FTE allocation is projected for FY10-11due to: <br />Reducing a full-time laboratory Wastewater Technician to part-time (-0.43 FTE reduction). <br />Fund Reallocations – During the preparation of the annual budget proposal, the distribution of <br />FTE hours for regional and non-regional activities from the previous year are reviewed and <br />adjustments are made to the proposed year’s budget. This is done to project proper charges of <br />staffing based on actual time spent between the regional and local funds, and considering <br />planned labor activities for the coming fiscal year. (+0.05 FTE increase) <br />Regular Wages – $4,605,994 [Increase of $217,188 or 4.9%] <br />Salaries are based upon negotiated management/labor contracts between the City of Eugene and <br />the local union (AFSCME). The Cost of Living (COLA) is projected at 2.0%. <br />The increase is also a result of a budgeting change in the Regular Wages account in which costs <br />that were previously budgeted for contracted extra help in the materials and services budget <br />were moved into the Regular Wages account and budgeted for personnel costs. <br />Page 33 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.