My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Eugene Budget Detail <br />Overtime - $92,020 [Decrease of $17,000 or -16%] <br />Overtime hours were adjusted to reflect a reduction in overtime hours needed to backfill vacant <br />positions. <br />Health Insurance - $931,723 [Decrease of $26,783 or -3%] <br />The decrease is based on group claims experience and cost projections. Rates are allocated <br />based on the number of employees. <br />Materials and Services <br />The proposed Materials and Services budget totaling $4,589,982 represents a total FY 10-11 <br />increase of $99,546 or 2.2%. The major changes are in the following budget categories: <br />Contractual Services – $391,020 [Decrease of $71,296 or -15%] <br />While this expense category was decreased in several program areas, $19,000 was added to the <br />budget for temperature and turbidity monitoring to meet new regulatory requirements. <br />Fleet Operating Charges – $332,767 [Decrease of $40,972 or -11%] <br />Each year fleet rates are estimated by proportioning historic costs by vehicle category. The <br />decrease in this line item is based on previous year’s expenditures for equipment. <br />Computer Equipment, Supplies, Maintenance - $221,948 [Increase of $35,547 or 19%] <br />The proposed budget includes $55,000 for replacing 9 year-old treatment plant data <br />processing software used to meet regulatory reporting requirements, provide analytical <br />trending analysis, and historical retention of process environment data. <br />Page 34 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.