My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />PEAK FLOW MANAGEMENT IMPROVEMENTS <br />Description: <br /> The Peak Flow Management project combines several project elements described in the <br />2004 Facilities Plan into one project. These are 1) the Parallel Primary/Secondary <br />Treatment project, 2) the Bankside Outfall project, 3) the Outfall Mixing Zone Study, and <br />4) the design and construction of the high rate disinfection basins, which was pulled out <br />of the Sodium Hypochlorite Conversion project and added to the Peak Flow <br />Management project. These project elements combine to provide the hydraulic <br />infrastructure necessary to convey the peak flow through the plant, split the flow into the <br />parallel primary and secondary treatment trains, provide additional disinfection capacity, <br />and discharge the treated flow in accordance with the 2004 Facilities Plan. <br />Status: <br />Construction stage. The majority of the construction was completed in December 2009. <br />The work remaining in FY 10-11 is landscaping. <br />Justification: <br /> This project expands the peak wet weather treatment capacity to 277 mgd through flow <br />management techniques. <br />Project Driver: <br />DEQ requirement that the peak wet weather flow (5-year, 24-hour rain event) be treated <br />by the E/S WPCF and meet secondary effluent standards (diverted blended flow <br />receives equivalent of primary treatment). <br />Project Trigger: <br />Elimination of sanitary sewer overflows by the year 2010. <br />Project Type: <br />100% Capacity <br />Improvement <br /> SDC Eligibility: <br /> 30.2% <br />Estimated Project Cost <br />: $20,872,000 <br />Expected Cash Flow: <br />FY 06-07 = $28,913; FY 07-08 = $1,496,808; FY 08-09 = $11,346,006, <br />FY 09-10 = $5,000,000; FY 10-11 = $2,992,843; FY 11-12 = $7,157 <br />2009-10 <br />Expenditure/Category:Prior YearsEst. Act.2010-112011-122012-132013-142014-15Total <br />Design/Construction $12,871,727 $5,000,000 $3,000,000 $0$0$0$0$20,871,727 <br />Other $0$0$0$0$0$0$0$0 <br />Total Cost $12,871,727 $5,000,000 $3,000,000 $0$0$0$0$20,871,727 <br />Page 56 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.