My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />WASTE ACTIVATED SLUDGE THICKENING <br />Description: <br /> This project provides a third gravity belt thickener (GBT) and associated at-grade <br />building improvements. The project also includes landscaping. <br />Justification: <br /> Provides additional capacity for Waste Activated Sludge (WAS) thickening and, along <br />with addition of primary sludge thickening, will help to eliminate the need for additional <br />digester capacity. <br />Status: <br />Planning stage with the exception of landscaping (in keeping with the 2004 Facilities <br />Plan landscaping budget allocations, funding from this project is being made available in <br />FY 10-11 to accommodate staging of the plant-wide integrated landscape plan). <br />Project Driver: <br />Additional capacity to provide WAS thickening with one unit offline at upper limit flow <br />projections. Nitrification required by the NPDES permit and increasing wastewater flows <br />and loads generates more WAS solids. Provide ability to conduct recuperative <br />thickening so that need for additional digestion volume can potentially be deferred. <br />Project Trigger: <br />Exceeding solids and hydraulic loading rate design criteria.The latest evaluations of <br />need for Waste Activated Sludge thickening indicates a need by about 2012 or later. <br />After the secondary treatment modifications are completed and operational for a time, <br />the timing of need for this project should be reevaluated. <br />Estimated Project Cost <br />: $3,901,000 <br />Improvement <br /> SDC Eligibility: <br /> 100% <br />Expected Cash Flow: <br />FY 06-07 = $7, 000; FY 08-09 = $0; FY 09-10 = $0; FY 10-11 = $200,000; <br /> FY 11-12 = $100,000; FY 12-13 = $200,000; FY 13-14 = $1,100,000; <br /> FY 08-09 = $2,294,000 <br />Expenditure/Category:Prior Years2009-10 Est. Act.2010-112011-122012-132013-142014-15Total <br />Design/Construction $7,000 $0$300,000 $0$3,594,000 $0$0$3,901,000 <br />Other $0$0$0$0$0$0$0$0 <br />Total Cost $7,000 $0$300,000 $0$3,594,000 $0$0$3,901,000 <br />Page 64 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.