My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />INCREASE DIGESTION CAPACITY <br />Description: <br /> Installation of a fourth conventional high rate digester for continued production and <br />expanded production of Class B biosolids. <br />Justification: <br /> Continue to meet the requirements for Class B digestion with the ability to take one <br />digester out of service for cleaning. <br />Project Driver: <br />This project addresses the need for more anaerobic digestion capacity. In the 2004 <br />MWMC Facilities Plan, an option was identified to also change the existing digestion <br />method in order to produce Class A biosolids. This option was to be considered as a <br />strategy to secure a wider range of beneficial end-use options in the case that that <br />flexibility was needed for beneficial reuse. Since that time, MWMC has taken effective <br />steps to expand the ability to handle Class B biosolids through the construction and <br />expansion of the Biocycle Poplar Plantation, and through working with other end users. <br />Also, studies have shown that the current solids handling system will actually produce a <br />Class A product because of the extended storage time available for biosolids in the <br />lagoons at the biosolids handling facility. The digestion capacity issue will be influenced <br />by several operational factors including the effectiveness of new primary sludge <br />thickening and expanded WAS thickening processes, as well as digester cleaning <br />protocols and schedules. Observation over the next several years is required prior to <br />making a decision on when the expanded digestion facilities will be needed. A restudy <br />of the anaerobic digestion system function and capacity should be undertaken prior to <br />moving forward with this digestion expansion project. This study can be conducted as <br />part of the Facilities Plan Engineering Services contract with CH2M HILL. <br />Project Trigger: <br />The trigger for design and construction of new digestion facilities will depend on the <br />findings of the digestion system capacity and process alternatives study, which will be <br />started in FY 2011 under the continuing Facilities Plan Engineering Services contract. <br />Improvement <br /> SDC Eligibility: <br />54% <br />Estimated Project Cost <br />: $8,600,000 <br />Expected Cash Flow: <br />FY 10-11 = $249,000; FY 11-12 = $251,000; FY 12-13 = $3,782,000 <br /> FY 13-14 = $4,318,000 <br />Prior2009-10 <br />Expenditure/Category:YearsEst. Act.2010-112011-122012-132013-142014-15Total <br />Design/Construction $0$0$500,000 $0$8,100,000 $0$0$8,600,000 <br />Other $0$0$0$0$0$0$0$0 <br />Total Cost $0$0$500,000 $0$8,100,000 $0$0$8,600,000 <br />Page 65 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.