<br />th <br />26 <br />way. If adopted as currently drafted, Major Arterials such as West 11 Avenue would require a minimum <br />of 200 feet between access locations. <br />Existing Access Conditions <br />th <br />DKS conducted an inventory of the existing driveways along West 11 Avenue from Green Hill Road to <br />th <br />Chambers Street. There are approximately 193 driveways on West 11 Avenue between Green Hill Road <br />and Chambers Street (approximately 4.5 miles of roadway). The driveways provide access to residential, <br />industrial, commercial, and office uses along the corridor. Figures 6-1 through 6-4 show the existing <br />th <br />driveways along West 11 Avenue. Each driveway is designated with a number for purposes of this report. <br />Appendix C provides a table that summarizes the driveway inventory and the businesses that take access <br />from the associated driveway. <br />Access spacing is an important consideration when determining the needed access management strategies. <br />When access spacing is determined, the private driveways and public streets on both sides of the street are <br />th <br />accounted for. A summary of the access spacing and density for various segments of West 11 Avenue is <br />provided in Table 6-1. As shown, access density is greater than 60 accesses per mile for the majority of the <br />corridor. As indicated previously (see Figure 6-1 and associated discussion), national data indicates that <br />there are significantly more crashes when there are more than 50 access points per mile. Therefore, access <br />th <br />management strategies are needed along the majority of West 11 Avenue and in particular east of Beltline <br />Road. <br />th <br />Table 6-1: West 11 Avenue Existing Access Summary <br />a <br />Access Points <br />Posted Segment <br />th <br />West 11 Ave Roadway Section <br />Speed Distance <br />Number Density (per mile) <br />Green Hill Rd to Beltline Rd 45-55 mph 1.80 mi 24 13.3 <br />Beltline Rd to Bailey Hill Rd 45 mph 1.25 mi 76 60.8 <br />Bailey Hill Rd to Garfield St 35 mph 1.25 mi 89 71.2 <br />Garfield St to Chambers St 30 mph 0.25 mi 37 148.0 <br />a <br /> All access points are included (i.e., public streets and private driveways). <br /> <br />Recommendations <br />Recommended access management improvements include a short-term access management plan and the <br />implementation of access management strategies by the City of Eugene. <br />SHORT-TERM ACCESS MANAGEMENT PLAN <br />A short-term access management plan was prepared and specific treatments are also shown in Figures 6-1 <br />through 6-4. These treatments include closures, consolidation of accesses and relocation of access <br />th <br />driveways along West 11 Avenue to improve safety, circulation, and traffic operations. The plan also <br />includes the installation of traffic separators and medians in selective locations to improve safety and <br />enhance operations and improve safety. In addition, the findings from the safety analysis (see Chapter 5) <br /> <br />26 <br /> *Draft*,Managing Connections to the Public Right-of-Way, City of Eugene, Not dated. <br /> <br /> <br />th <br />West 11 Avenue Corridor Study September 4, 2009 <br />City of Eugene P07265-003-000 <br />43 <br />