My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: TransPlan and Metro Plan Amendments
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 08/09/10 Meeting
>
Item 5: TransPlan and Metro Plan Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2010 11:44:54 AM
Creation date
8/6/2010 10:35:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
8/9/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the amendments. The amendments will not change TransPlan’s and the Metro Plan’s provisions <br />related to the protection and maintenance of the scenic, historical, economic and recreational qualities of <br />lands along the Willamette River. Further, the amendments will not affect TransPlan’s and the Metro <br />Plan’s compliance with Goal 15. Therefore, the amendments comply with Goal 15. <br /> <br />GOALS 16-19 – COASTAL GOALSEstuarine Resources, Coastal Shorelines, Beaches and <br />: ( <br />Dunes, and Ocean Resources) <br /> <br />There are no estuarine resources, shorelines, beaches, dunes, or ocean resources located within the Metro <br /> <br />Plan or TransPlan boundary. Accordingly, Goals 16, 17, 18, and 19 are not applicable. <br /> <br />Criterion B. Adoption of the amendment must not make the Metro Plan internally inconsistent. <br /> <br />TransPlan guides regional transportation system planning and development in the Eugene-Springfield <br />metropolitan area. The region covered by TransPlan is the “TransPlan Study Area”, which is an area <br />extending beyond the UGB and Metro Plan boundary that is used for transportation modeling purposes. <br />TransPlan includes provisions for meeting the transportation demand of a projected population of <br />296,500 in the TransPlan Study Area. When TransPlan was updated in 2001, it was anticipated that the <br />TransPlan Study Area’s population would reach 296,500 in 2015. It is now anticipated that the TransPlan <br />Study Area’s population will not reach 296,500 until approximately 2027. Since the transportation <br />modeling for the TransPlan Study Area was based on a projected population of 296,500, TransPlan <br />guides regional and transportation system planning and development in the Transportation Study Area <br />until 2027. <br /> <br />The proposed amendments to the Metro Plan and TransPlan will not make the Metro Plan internally <br />inconsistent. While the proposed TransPlan amendments necessitate that the text of the Metro Plan’s <br />Transportation Element be amended to ensure internal consistency of the Metro Plan; these needed Metro <br />Plan text amendments are proposed along with the TransPlan amendments. Together, the proposed <br />amendments to the Metro Plan and to TransPlan are consistent with each other and the other provisions <br />of the Metro Plan. Additionally, the amendments are consistent with applicable Metro Plan findings and <br />policies; specific findings and policies being discussed below. <br /> <br />B. Economic Element <br /> <br />B.18 Encourage the development of transportation facilities which would improve access to <br />industrial and commercial areas and improve freight movement capabilities by <br />implementing the policies and projects in the Eugene-Springfield Metropolitan Area <br />Transportation Plan (TransPlan) and the Eugene Airport Master Plan. <br />The amendments to TransPlan’s project lists, which delete transportation projects that have been <br />constructed, demonstrate consistency with Policy B.18. Specifically, the deletions from TransPlan’s <br />project lists identify the following transportations projects as having been completed: Jasper Road <br />Extension, Project No. 66 (Construct 4-lane arterial); Pioneer Parkway Extension, Project No. 768 <br />(Construct 4-5 lane minor arterial); Beltline Highway, Project No. 409 (Widening to 4 lanes, construction <br />of Roosevelt extension). <br /> F. Transportation Element <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.