My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4 - Ord./Metro Plan Amend.
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-07/26/04Mtg
>
Item 4 - Ord./Metro Plan Amend.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:09:51 PM
Creation date
7/21/2004 9:07:50 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/26/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Modify Chapter IV. Of the Public Facilities and Services Plan, by modifying <br /> the discussion of wastewater, in the subdivision entitled "Long-Term Service <br /> Availability Within Urbanizable Areas" (presently on page 97) to read as <br /> follows: <br /> <br />1. There are no areas within the metropolitan UGB that will be difficult to serve with <br />wastewater facilities over the long-term (six to 20 years) assuming that public <br />infrastructure specifications and requirements of the developing area can be <br />addressed. Appropriate engineering design practices must be used during the <br />development and expansion into sensitive areas that are approved for <br />development (ex. - hillside construction, etc.).,' ~.,~ ................, ,~ · ,~-, ,,~v,,-o,,-l;^" Expansion of <br />the existing collection system will be necessary to meet demands of growth over <br />this time period. <br />2. Based on 2003 analysis, the Eugene-Springfield metropolitan area treatment <br />facilities will require facility improvements to address both dry and wet weather <br />regulatory requirements relating to pollutant loads and wastewater flows. <br />Regional and local wastewater improvements to the collection and treatment <br />systems are being planned for and will be implemented to allow for growth within <br />the UGB and for regulatory compliance. <br />6. Add Table 16a following Table 16, as follows: <br />Table 16a <br />MWMC Wastewater Treatment and Collection System Improvements, Rough Cost <br />Estimate, and Timing Estimate <br /> <br /> 300 WPCF Treatment Project I $120,500,000 2025 <br /> I <br /> 301 Residuals Treatment Project $6,000,...,., 2018 <br /> 302 Beneficial Reuse Project $25,000,000 2018 <br /> 303 Willakenzie Pump Station $6,000,000 2010 <br /> 304 Screw Pump Station $2,000 ...... 2010 <br /> 305 Glenwood Pump Station $500,000 2012 <br /> · Cost estimated in 2004 dollars <br /> <br /> Appendix B Page 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.