My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4 - Ord./Metro Plan Amend.
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-07/26/04Mtg
>
Item 4 - Ord./Metro Plan Amend.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:09:51 PM
Creation date
7/21/2004 9:07:50 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/26/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Add a new chapter to the Public Facilities and Services Plan, to be Chapter <br /> VI., reading as follows: <br /> <br />VI. Amendments to the Plan <br /> <br />This chapter describes the method to be used in the event it becomes necessary or <br />appropriate to modify the text, tables or the maps contained in the Public Facilities and <br />Services Plan ("the Plan"). <br /> <br /> Flexibility of the Plan <br /> <br />Certain public facility project descriptions, location or service area designations will <br />necessarily change as a result of subsequent design studies, capital improvement <br />programs, environmental impact studies and changes in potential sources of funding. The <br />Plan is not designed to either prohibit projects not included in the plan for which <br />unanticipated funding has been obtained, preclude project specification and location <br />decisions made according to the National Environmental Policy Act, or subject <br />administrative and technical changes to the plan to post-acknowledgement review or <br />review by the Land Use Board of Appeals. <br /> <br />For the purposes of this Plan, two types of modifications are identified. <br /> <br />A. Modifications requiring amendment of the Plan. <br /> The following modifications require amendment of the Plan: <br /> <br /> 1. Amendments, which include those modifications or changes (as <br /> represented by Table 16a) to the location or provider of public facility <br /> projects which significantly impact a public facility project identified in <br /> the comprehensive plan, and which do not qualify as administrative or <br /> technical and environmental changes, as defined below. Amendments are <br /> subject to the administrative procedures and review and appeal procedures <br /> applicable to land use decisions. <br /> 2. Adoption of capital improvement program project lists by any service <br /> provider do not require modification of this Plan unless the requirements <br /> of subparagraph 1 above are met. <br /> <br />B. Modifications permitted without amendment of the Plan. <br /> The following modifications do not require amendment of this Plan: <br /> <br /> 1. Administrative changes are those modifications to a public facility project <br /> which are minor in nature and do not significantly impact the project's <br /> general description, location, sizing, capacity or other general <br /> characteristic of the project. <br /> 2. Technical and environmental changes are those modifications to a public <br /> facility project which are made pursuant to "final engineering" on a project <br /> <br /> Appendix B Page 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.