My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Draft EUG Master Plan Update, February 2010
COE
>
City of Eugene
>
Ordinances
>
2010 No. 20450-20469
>
Ordinance No. 20463
>
Draft EUG Master Plan Update, February 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2010 5:36:43 PM
Creation date
9/29/2010 5:35:49 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20463
Document_Title
Draft EUG Master Plan Update, February 2010
Adopted_Date
9/27/2010
Approved Date
9/27/2010
Signer
Kitty Piercy
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHAPTER5 <br />FINANCIAL FEASIBILITY ANALYSIS <br />5. <br />Historical and Projected Airport Operating Expenses <br />Table 5-6 <br />The Airport’s historical operating expenses for FY 2003 through FY 2009 are presented in . As <br />shown in this table, personnel expenses (including salaries, labor, and employee benefits) have <br />consistently represented the largest category of Airport expenditures over these years. It is expected that <br />during FY 2009 personnel costs will total $3,680,839 and represent approximately 56 percent of all <br />operating expenses of the Airport. The next largest components of total Airport operating expenditures <br />are materials and supplies ($817,951), contractual services ($519,040), utilities ($415,329), maintenance <br />and repair ($308,233), and rent ($224,500). <br />Estimates of the Airport’s future operating expenses were developed based on a review of historical <br />trends, the Airport’s FY 2009 expenses, and incremental adjustments that might occur due to facility <br />Table 5-7 <br />expansions planned at the Airport over the projection period. presents actual FY 2007 <br />expenses, budgeted expenses for fiscal years 2008-2009, and projected operating expenses for the <br />period FY 2010 through FY 2016. For purposes of this analysis, expenses at the Airport are examined in <br />the following classifications: <br />Salaries and Labor <br />Employee Benefits <br />Maintenance and Repairs <br />Utilities <br />Contractual Services <br />Insurance <br />Summary of Projected Total Airport Expense <br />These operating expense categories represent all expenses associated with the day-to-day operations of <br />the Airport. Each expense category, and the assumptions used to project expenses for each, is <br />discussed in the following sections. <br />5.1 Salaries and Labor <br />Salaries and labor represent personnel expenditures for Airport management, administrative, fire <br />department, and operations and maintenance employee salaries and wages. Between FY 2003 and FY <br />2009, these costs increased from $1,946,366 to $2,379,173. As shown in Table 5-7, future salaries and <br />labor expenses are projected to increase from $2,379,173 in FY 2009 to $3,000,276 in FY 2016, <br />representing a compounded annual increase of approximately 3.0 percent. These projections were <br />developed based on an estimated rate of inflation as well as the need to hire two (2) additional Airport <br />Maintenance Workers in FY 2012 to support the expanded terminal building. <br />5.2 Employee Benefits <br />Employee benefits expenses include fringe benefit costs, such as employee wage-related taxes, health <br />care, and employee pension. Employee benefits increased from $899,385 in FY 2003 to $1,301,666 in <br />FY 2009. This category of Airport operating expense is projected to increase approximately 6.0 percent <br />per year from FY 2009 to FY 2016 from $1,301,666 in FY 2009 to $2,005,401 in FY 2016. <br />5-22 <br />Eugene Airport Master Plan Update <br />(February 2010) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.