Laserfiche WebLink
CHAPTER 3 <br />FACILITY REQUIREMENTS <br />Table 3-6: Rental Car Parking Requirements <br />Rental Car Parking <br />Passenger <br />Return/ReadyStorage/Service <br />Enplanements <br />Year <br />Required AvailableRequired Available <br />2006 360,258 108 144 144 115 <br />2011 412,873 124 165 <br />2016 445,593 134 178 <br />2026 557,736 167 223 <br />Contingency 700,000 210 280 <br />Source: Mead & Hunt <br />The 144 available return/ready spaces are expected to be sufficient through 2016, but 23 additional <br />spaces are expected to be required by 2026, and 66 additional spaces will likely be needed under the <br />Contingency Demand scenario. <br />The 115 available storage/service spaces are currently insufficient. 29 additional spaces are required <br />today, 108 are expected to be required by 2026, and 165 additional spaces will likely be needed under <br />the Contingency Demand scenario. <br />Improvements to the ready/return lot should be in the existing location, as it is convenient to pedestrians <br />and vehicles accessing the passenger terminal. As rental car storage/service lots and facilities are <br />added/expanded, consideration should be given to abandoning the current site and relocating them to <br />another part of the airfield that can accommodate their operation and long-term expansion. The south <br />airfield area, along the east-west section of Airport Road, is likely an appropriate site. Relocation of the <br />storage/service lot out of the terminal area will make the site available for public, rental car ready/return, <br />or employee automobile parking. <br />Options for providing rental car parking will be explored and considered in Chapter Four, Alternate Plan <br />Concepts. <br />Employee Parking <br />The employee parking area consists of two adjacent lots north of the terminal area, accessed by <br />Lockheed Drive. One lot with 117 spaces is assigned to Airport employees. The second lot has 48 <br />spaces that are used also by Airport Administration, TSA, FBO, north corporate and general aviation <br />area, and on-airport businesses. <br />It is estimated that a 20 percent increase in employees will be sufficient to meet the needs of the Airport <br />over the study period. An increase in employee parking spaces of 20 percent (for a total of 140 spaces) <br />has been included in the parking requirements for the baseline growth conditions. Since the Airport <br />employee parking area is commonly full, increased parking should be planned for in the near-term. <br />As the north ramp FBO and old ATCT area is reconfigured for modern facilities and utilization, <br />consideration should be given to the adequacy of the automobile parking in this area. <br />3-22 <br />Eugene Airport Master Plan Update <br />(February 2010) <br /> <br />