Metro Plan Consistency -- EC 9.8424(1)(b) and LC 12.060 <br /> The Metro Plan serves as the area's comprehensive, policy framework plan. The current update to <br /> the Eugene Airport Master Plan replaces earlier versions as a refinement to the Metro Plan, and is <br /> found to be consistent with the policy framework already established by the Metro Plan. As <br /> previously discussed, adoption of the updated master plan is supported by a variety of Metro Plan <br /> policies including the following from the Transportation Element (Policy F.30, Page III- F -12): <br /> Support public investment in the Eugene Airport as a regional facility and provide land use <br /> controls that limit incompatible development within the airport environs. Continue to use <br /> the Eugene Airport Master Plan as the guide for improvements of facilities and services at <br /> the airport. <br /> As stated previously, unlike the adoption process for the 1999 Airport Master Plan, the current <br /> update does not include any amendments to the Metro Plan or other locally adopted plans such as <br /> the Eugene - Springfield Transportation System Plan (Transplan). No changes to existing land use <br /> designations, zoning, or adopted policy are proposed. The current update does include <br /> recommendations for a variety of airport improvements that will accommodate the Airport's <br /> needs into the future, some of which will require further research and analysis to determine the <br /> need and timing for any future Metro Plan amendments or zone changes in the vicinity. It is <br /> emphasized that any specific Metro Plan amendments or zone changes necessary to implement <br /> the recommendations of the updated Eugene Airport Master Plan will require additional public <br /> process and formal adoption by the affected jurisdiction(s) in the future. <br /> Based on the available information and findings above, adoption of the current master plan <br /> update is consistent with the Metro Plan and will not otherwise make the Metro Plan internally <br /> inconsistent, as required. <br /> Refinement Plan Criteria -- EC 9.8424(1)(c) and (2) <br /> Adoption of the current Eugene Airport Master Plan update will entirely replace earlier adopted <br /> versions and there are no remaining portions of prior plans to be addressed under EC 9.8424(1)(c). <br /> The need for adoption of the updated refinement plan is based on federal and state and local <br /> requirements for coordinated aviation planning. Consistent with EC 9.8424(2)(b), new inventory <br /> information contained in the master plan update, concerning airport facilities and projected <br /> demand, supports the recommendations for future improvements to accommodate the Eugene <br /> Airport's needs through the planning horizon of 2026. <br />