Laserfiche WebLink
Status Sub -Total $4,455 <br />Project Category Sub -Total $4,455 500 <br />Fatal Capital Projects: Bicycle Projects $19 <br />TransPlan <br />Judy 2002 <br />� Chapter 3, Page 50 <br />Geographic <br />Estimated <br />Name <br />Limits <br />Description <br />Jurisdiction <br />Cost <br />Length <br />Number <br />Valley River Wa (A) <br />Valley River Drive to <br />Striped Lane <br />Eugene <br />$200,004 <br />0. 23 <br />694 <br />Valley River Connector <br />Van Duyn Road I <br />Bogart Road <br />Westem Drive to <br />Willakenzie Road <br />Route <br />Eugene <br />$0 <br />0.61 <br />698 <br />Walnut Avenue <br />1 5th Avenue to Fairmont <br />Route <br />Eugene <br />$0 <br />0.36 <br />295 <br />Boulevard <br />h Kell Road to M <br />Real <br />Willamette Street <br />1 8th Avenue to 32nd <br />Striped Lane <br />Eugene <br />$396,000 <br />1, 30 <br />296 <br />Wirl ai}7@tte Street '"' <br />Avenue <br />Yolanda Avenue <br />31 st Street to Hayden <br />Striped Lane <br />Springfield <br />$0 <br />0,80 <br />784 <br />Bridge Road <br />Status Sub -Total $4,455 <br />Project Category Sub -Total $4,455 500 <br />Fatal Capital Projects: Bicycle Projects $19 <br />TransPlan <br />Judy 2002 <br />� Chapter 3, Page 50 <br />