Metropolitan Wastewater Management Commission Capital Improvement Program <br />WPCF. It was funded by existing budgeted MWMC Capital Projects. Hereafter, <br />implementation of the landscape detailed design and construction will likewise be funded <br />through existing and approved project budgets.) <br />Carryover Capital Projects (Projects Initiated in FY 10-11 or Earlier) <br />Most or all (depending on the specific project) of the remaining funding for capital projects that were <br />started or are on-going in FY 10-11 is carried over in this FY 11-12 budget. CIP project summary <br />sheets for these carryover projects are included in this document. Overall, the funding for these projects <br />continues to be consistent with the CH2M Hill 2006 re-costing of capital projects. The on-going <br />carryover projects are: <br />WWFMP Update <br />Facilities Plan Engineering Services <br />Influent Pumping and Headworks Expansion (Landscape funding only) <br />Sodium Hypochlorite Conversion <br />Peak Flow Management Improvements (Landscape funding only) <br />Odorous Air Treatment - Phase 2 <br />Primary Sludge Thickening <br />Tertiary Filtration - Phase 1 <br />Effluent Reuse - Phase 1 <br />Effluent Reuse - Phase 2 <br />Line Biosolids Lagoon – Phase 3 <br />Increase Digestion Capacity <br />Waste Activated Sludge Thickening <br />Repair and/or Partial Replacement of Biosolids Force Main <br />2010 Partial Facility Plan Update <br />New Projects for the FY 11-12 Capital Budget <br />Consistent with the Facilities Plan project list and the FY 10-11 CIP, several additional projects are <br />rolling from the second year of the adopted FY 10-15 CIP, into the first year of the FY 11-16 CIP, and <br />therefore into the FY 11-12 Capital Budget. CIP project summary sheets for these projects are included <br />in this document. <br />The following new project was added in the FY 11-12 Capital budget: <br />Line Biosolids Lagoon—Phase 4 <br />Summary of FY 10-11 Capital Budget <br />The following summary table Exhibit 12 on page 41– Summary of FY 11-12 MWMC Construction <br />Program Capital Budget shows the adjusted budget and end-of-year estimates for expenditures for the <br />FY 10-11 Capital Budget and the amount of funding that is expected to be carried over to FY 11-12 for <br />those projects that are ongoing to FY 11-12. Also shown is additional funding and new projects in the <br />FY 11-12 Capital Budget. The projects are organized in the table by where they are in the funding <br />Page 40 DRAFT FY 11-12 BUDGET AND CIP <br />