Metropolitan Wastewater Management Commission Capital Improvement Program <br />SODIUM HYPOCHLORITE CONVERSION <br />Description: <br /> Convert the existing chlorine gas system to sodium hypochlorite for the base and wet weather flows. <br />Retain the existing chlorine contact basins for the disinfection process. Install new system with capability <br />for high rate disinfection of primary effluent diversion using dosages of sodium hypochlorite into a new <br />contact basin structure. The new contact basin has been split off of this project and is now part of a <br />different MWMC project (Peak Flow Management Improvements), so the budget for that portion of the <br />project has also been moved. Staff included upgrades of the existing recreational vehicle (RV) <br />wastewater dump station to accommodate boat wastewater dumping in the construction bid documents <br />for the sodium hypochlorite conversion project. The boat wastewater dump modification was designed <br />and grant funded by the Oregon State Marine Board that the MWMC approved for implementation at the <br />September 21, 2006 public meeting. The recommended project budget below includes $80,000 allocated <br />to the project for the boat wastewater dump that was reimbursed by the State agency after construction <br />was completed. Some of the project funding will support the treatment plant landscape upgrades. <br />Status: <br />The upgraded disinfection system has been continuously used since March of 2010. As of December 22, <br />2010, Emery and Sons Construction and a vendor are following up on improving the sodium hypochlorite <br />injection/mixing system related to the specified performance requirements. Completion of this system is <br />anticipated in early 2011. <br />Justification: <br /> <br />Liquid sodium hypochlorite and sodium bisulfite system will replace the existing chlorine and sulfur <br />dioxide gas systems and increase the disinfection capacity from 175 mgd to 277 mgd. The high rate <br />disinfection of the primary effluent is a key component of the primary/secondary split treatment process, <br />which is needed for meeting the peak flow capacity needs of the wastewater treatment plant. <br />Project Driver: <br />Operator and community safety issues and meeting flow capacity requirements for peak flows. <br />Project Trigger: <br />Phasing with other related MWMC projects and the need to meet peak flow treatment requirements. <br />Project Type: <br />50% Capacity;50% Performance <br />Improvement SDC Eligibility: <br />25% <br />Estimated Project Cost: <br />$7.8 million (part of the project money will support the treatment plant landscape upgrades) <br />Expected Cash Flow: <br />FY 06-07 = $1,353; FY 07-08 = $594,520; FY 08-09 = $3,319,347; FY 09-10 = $(102,501); FY <br />10-11 = $1,010,281; FY 11-12 = $250,000; FY 12-13 = $50,000; FY 13-14 = $2,677,000 (construction, landscape, <br />administration, consultant services) <br />2010-11 <br />Expenditure/Category:Prior Years2011-122012-132013-142014-152015-16Total <br />Est. Act. <br />Design/Construction $3,812,719 $1,010,281 $2,977,000 0000$7,800,000 <br />Other 00000000 <br />Total Cost $3,812,719 $1,010,281 $2,977,000 $0$0$0$0$7,800,000 <br />Page 52 DRAFT FY 11-12 BUDGET AND CIP <br />