Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />WASTE ACTIVATED SLUDGE THICKENING <br />Description: <br /> This project provides a third gravity belt thickener (GBT) and associated at-grade <br />building improvements. The project also includes landscaping. <br />Status: <br />Planning stage with the exception of landscaping (in keeping with the 2004 Facilities <br />Plan landscaping budget allocations, funding from this project is being made available in <br />FY 11-12 to accommodate staging of the plant-wide integrated landscape plan). <br />Justification: <br /> Provides additional capacity for Waste Activated Sludge (WAS) thickening and, along <br />with addition of primary sludge thickening, will help to eliminate the need for additional <br />digester capacity. <br />Project Driver: <br />Additional capacity to provide WAS thickening with one unit offline at upper limit flow <br />projections. Nitrification required by the NPDES permit and increasing wastewater flows <br />and loads generates more WAS solids. Provide ability to conduct recuperative <br />thickening so that the need for additional digestion volume can potentially be deferred. <br />Project Trigger: <br />Exceeding solids and hydraulic loading rate design criteria.The latest evaluations of <br />need for Waste Activated Sludge thickening indicates a need by about 2012 or later. <br />After the secondary treatment modifications are completed and operational for a time, <br />the timing of need for this project should be reevaluated. <br />Estimated Project Cost <br />: $3,901,000 <br />Improvement <br /> SDC Eligibility: <br /> 100% <br />Expected Cash Flow: <br />FY 06-07 = $7, 000; FY 07-08 = $0; FY 08-09 = $0; FY 09-10 = $0; <br /> FY 10-11 = $107,400; FY 11-12 = $17,724; FY 12-13 = $202,965; <br /> FY 13-14 = $1,100,500; FY 14-15 = $2,465,411 <br />Expenditure/Category:Prior Years2010-11 Est. Act.2011-122012-132013-142014-152015-16Total <br />$7,000$107,400$192,600$3,601,600$0$0$0$3,901,000 <br />Design/Construction <br />Other$0$0$0$3,601,600$0$0$0$0 <br />$7,000$107,400$192,600$3,601,600$0$0$0$3,901,000 <br />Total Cost <br />Page 61 DRAFT FY 11-12 BUDGET AND CIP <br />