My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2011
>
CC Agenda - 05/23/11 Meeting
>
Item 3: Ratification of MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2011 9:40:12 AM
Creation date
5/20/2011 1:36:38 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />INCREASE DIGESTION CAPACITY <br />Description: <br /> Installation of a fourth conventional high rate digester for continued production and expanded <br />production of Class B biosolids. <br />Status: <br />Planning stage with the exception of landscaping (in keeping with the 2004 Facilities Plan <br />landscaping budget allocations, funding from this project is being made available in FY 11-12 to <br />accommodate staging of the plant-wide integrated landscape plan). <br />Justification: <br /> Continue to meet the requirements for Class B digestion with the ability to take one digester out <br />of service for cleaning. <br />Project Driver: <br />This project addresses the need for more anaerobic digestion capacity. In the 2004 MWMC <br />Facilities Plan, an option was identified to also change the existing digestion method in order to <br />produce Class A biosolids. This option was to be considered as a strategy to secure a wider <br />range of beneficial end-use options in the case that that flexibility was needed for beneficial <br />reuse. Since that time, MWMC has taken effective steps to expand the ability to handle Class B <br />biosolids through the construction and expansion of the Biocycle Poplar Plantation, and through <br />working with other end users. Also, studies have shown that the current solids handling system <br />will actually produce a Class A product because of the extended storage time available for <br />biosolids in the lagoons at the biosolids handling facility. The digestion capacity issue will be <br />influenced by several operational factors including the effectiveness of new primary sludge <br />thickening and expanded WAS thickening processes, as well as digester cleaning protocols and <br />schedules. Observation over the next several years is required prior to making a decision on <br />when the expanded digestion facilities will be needed. A restudy of the anaerobic digestion <br />system function and capacity should be undertaken prior to moving forward with this digestion <br />expansion project. This study can be conducted as part of the Facilities Plan Engineering <br />Services contract with CH2M HILL. <br />Project Trigger: <br />The trigger for design and construction of new digestion facilities will depend on the findings of <br />the digestion system capacity and process alternatives study under the 2010 Facilities Plan <br />Update. <br />Improvement SDC Eligibility: <br />54% <br />Estimated Project Cost <br />: $8,600,000 <br />Expected Cash Flow: <br />FY 10-11 = $269,700; FY 11-12 = $286,200; FY 12-13 = $3,806,000; FY 13-14 = 4,238,100 <br />Prior2010-11 <br />Expenditure/Category:YearsEst. Act.2011-122012-132013-142014-152015-16Total <br />Design/Construction $0$269,700 $300,000 $8,030,300 $0$0$0$8,600,000 <br />Other $0$0$0$8,030,300 $0$0$0$0 <br />Total Cost $0$269,700 $300,000 $8,030,300 $0$0$0$8,600,000 <br />Page 62 DRAFT FY 11-12 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.