My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20326
COE
>
City of Eugene
>
Ordinances
>
2004 No. 20307-20332
>
Ordinance No. 20326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:26 PM
Creation date
8/2/2004 2:50:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/26/2004
Document_Number
20326
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with MWMC's discharge permit. MWMC's <br /> Capital Improvements Plan, as amended from time to time, <br /> shall be used as the guide for detailed planning and <br /> implementation of the WPCF project, the beneficial reuse <br /> project and the residuals project. <br /> <br />c. Stormwater: Drainage/channel improvements and/or piping systems 36 <br /> inches or larger; proposed detention ponds; outfalls; water quality <br /> projects; and waterways and open systems. <br /> <br />d. Specific projects adopted as part of the Metro Plan are described in the <br /> project lists and their general location is identified in the planned facilities <br /> maps in Chapter II of the Eugene-Springfield Metropolitan Public <br /> Facilities and Services Plan (Public Facilitzes and Services Plan). <br /> <br /> Appendix Aa Page 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.