My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-12-14
COE
>
City of Eugene
>
Administrative Orders
>
2012
>
Admin Order 58-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 2:23:00 PM
Creation date
11/7/2012 2:09:00 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
11/2/2012
Document_Number
58-12-14
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 Integrated Stormwater Management Strategy <br />WO -4: Open Channel Improvements: Regrade the existing open channel segments <br />(RSWO090Aa, RSWO09013, RSWO090C, and RSWO090D) from node 74405 <br />to 78833 (724'). <br />WO -5: Flood Control (Storage) at River Ave.: Construct a storage facility at node <br />77703 to provide approximately 124 acre -ft of storage. <br />The second category of flood control capital projects were identified to address new flows to the <br />system that would result from the decommissioning of public drywells. As these projects have a <br />significant water quality component, and to avoid duplication, these CPs are listed below under <br />the water quality strategy. <br />Water Quality Strategy <br />Capital Projects: Two categories of water quality capital projects were identified for <br />implementation. The first category of water quality CPs was identified to prevent water quality <br />impacts that would be associated with the decommissioning of drywells. If not addressed, these <br />impacts would include an increase in pollutant loads and impacts to the stream channels <br />associated with the increased flows. The projects to address /prevent these impacts are listed as <br />follows: <br />WO- I -UIC: <br />Green UIC Cluster Pipe and Pre -treat <br />WO -2 -UIC: <br />Corliss/ Carolyn/ Onyx UIC Cluster Rain Garden <br />WO -3 -UIC: <br />Autumn, Ross, Moore /Oak UIC Cluster Rain Garden <br />WO -4 -UIC: <br />Taz UIC Cluster Pipe and Pre -treat <br />WO -5 -UIC: <br />Silver Meadows UIC Cluster Rain Garden <br />WO -6 -UIC: <br />Poplar UIC Cluster Pipe and Pre -treat <br />WO -7 -UIC: <br />Kendra UIC Cluster Pipe and Pre -treat <br />WO -8 -UIC: <br />Kent UIC Cluster Pipe and Pre -treat <br />WO -9 -UIC: <br />Baywood UIC Cluster Rain Garden <br />WO -10 -UIC: <br />Greenwood UIC Cluster Rain Garden <br />WO -1 I -UIC: <br />Warrington UIC Cluster Rain Garden <br />Al -1 -UIC: <br />Crocker 1 UIC Cluster Pipe and Pre -treat <br />Al -2 UIC: <br />Crocker 2 UIC Cluster Rain Garden <br />Al -3 -UIC: <br />Shirley 1 UIC Cluster Pipe and Pre -treat <br />Al -4 -UIC: <br />Shirley 2 UIC Cluster Rain Garden <br />Al -5 -UIC: <br />Hamilton UIC Cluster Pipe and Pre -treat <br />Al -6 -UIC: <br />Bushnell UIC Cluster Pipe and Pre -treat <br />Al -7 -UIC: <br />Anderson UIC Cluster Rain Garden <br />Al -8 -UIC: <br />Escalante UIC Cluster Rain Garden <br />Al -9 -UIC: <br />Greenleaf UIC Cluster Pipe and Pre -treat <br />Al -10 -UIC: <br />Grove UIC Cluster Rain Garden <br />Al -11 -UIC: <br />Exeter UIC Cluster Rain Garden <br />Al -12 -UIC: <br />Brentwood UIC Cluster Rain Garden <br />Al -13 -UIC: <br />Korbel UIC Cluster Pipe and Pre -treat <br />Al -14 -UIC: <br />Howard UIC Cluster Rain Garden <br />Al -15 -UIC: South of Horn Lane UIC Cluster Street -Side Rain Gardens <br />0:\25695978 Eugene RR -SC Final Basin P1an\Master P1anTINAL 2- 2010\Master_Plan 3- 11- 10_FINAL_ Word _Version.doc 6 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.