Laserfiche WebLink
SECTION 6 Integrated Stormwater Management Strategy <br />WO -4: Open Channel Improvements: Regrade the existing open channel segments <br />(RSWO090Aa, RSWO09013, RSWO090C, and RSWO090D) from node 74405 <br />to 78833 (724'). <br />WO -5: Flood Control (Storage) at River Ave.: Construct a storage facility at node <br />77703 to provide approximately 124 acre -ft of storage. <br />The second category of flood control capital projects were identified to address new flows to the <br />system that would result from the decommissioning of public drywells. As these projects have a <br />significant water quality component, and to avoid duplication, these CPs are listed below under <br />the water quality strategy. <br />Water Quality Strategy <br />Capital Projects: Two categories of water quality capital projects were identified for <br />implementation. The first category of water quality CPs was identified to prevent water quality <br />impacts that would be associated with the decommissioning of drywells. If not addressed, these <br />impacts would include an increase in pollutant loads and impacts to the stream channels <br />associated with the increased flows. The projects to address /prevent these impacts are listed as <br />follows: <br />WO- I -UIC: <br />Green UIC Cluster Pipe and Pre -treat <br />WO -2 -UIC: <br />Corliss/ Carolyn/ Onyx UIC Cluster Rain Garden <br />WO -3 -UIC: <br />Autumn, Ross, Moore /Oak UIC Cluster Rain Garden <br />WO -4 -UIC: <br />Taz UIC Cluster Pipe and Pre -treat <br />WO -5 -UIC: <br />Silver Meadows UIC Cluster Rain Garden <br />WO -6 -UIC: <br />Poplar UIC Cluster Pipe and Pre -treat <br />WO -7 -UIC: <br />Kendra UIC Cluster Pipe and Pre -treat <br />WO -8 -UIC: <br />Kent UIC Cluster Pipe and Pre -treat <br />WO -9 -UIC: <br />Baywood UIC Cluster Rain Garden <br />WO -10 -UIC: <br />Greenwood UIC Cluster Rain Garden <br />WO -1 I -UIC: <br />Warrington UIC Cluster Rain Garden <br />Al -1 -UIC: <br />Crocker 1 UIC Cluster Pipe and Pre -treat <br />Al -2 UIC: <br />Crocker 2 UIC Cluster Rain Garden <br />Al -3 -UIC: <br />Shirley 1 UIC Cluster Pipe and Pre -treat <br />Al -4 -UIC: <br />Shirley 2 UIC Cluster Rain Garden <br />Al -5 -UIC: <br />Hamilton UIC Cluster Pipe and Pre -treat <br />Al -6 -UIC: <br />Bushnell UIC Cluster Pipe and Pre -treat <br />Al -7 -UIC: <br />Anderson UIC Cluster Rain Garden <br />Al -8 -UIC: <br />Escalante UIC Cluster Rain Garden <br />Al -9 -UIC: <br />Greenleaf UIC Cluster Pipe and Pre -treat <br />Al -10 -UIC: <br />Grove UIC Cluster Rain Garden <br />Al -11 -UIC: <br />Exeter UIC Cluster Rain Garden <br />Al -12 -UIC: <br />Brentwood UIC Cluster Rain Garden <br />Al -13 -UIC: <br />Korbel UIC Cluster Pipe and Pre -treat <br />Al -14 -UIC: <br />Howard UIC Cluster Rain Garden <br />Al -15 -UIC: South of Horn Lane UIC Cluster Street -Side Rain Gardens <br />0:\25695978 Eugene RR -SC Final Basin P1an\Master P1anTINAL 2- 2010\Master_Plan 3- 11- 10_FINAL_ Word _Version.doc 6 -2 <br />