Laserfiche WebLink
SECTION 3 <br />Flood Control Eualnation <br />Selected Flood Control Capital <br />Selected Flood Control Capital' <br />Conduits Addressed with Capital <br />Project Name <br />Project Description <br />Project <br />AI -5 <br />Upsize and replace the existing 3- <br />RSA1090E1, E2, and E3, <br />24" CMP culverts (RSA1090E) with <br />RSA1090F, RSA1100B.1, <br />a 2' x 8' box culvert. <br />RSA1100C, RSA1100D.1, <br />RSA1100E, RSA1100F.1, <br />RSA 1100G, and RSA 1100K <br />AI -6 <br />Upsize and replace the existing 24" <br />RSA1060U, RSA108013, <br />CMP culvert (RSA1060L) with a 2' <br />RSA1090A.1, RSA1060M, <br />x 4' box culvert. <br />RSA1060Q and RSA1060U <br />AI -7 <br />Upsize and replace the existing 18" <br />RSA1060H, RSA1060U, <br />and 24" CSP culverts (RSA1060G) <br />RSA108013, RSA1090A.1 <br />with a 2' x 4.5' box culvert. <br />AI -8 <br />Install a storage CP at nodes 72725 <br />RSA 116013, RSA 11601), <br />and 59020 to provide approximately <br />RSA I160F, RSA I160H <br />135 acre -ft of storage. <br />AI -9 <br />Conduct survey of open channel <br />RSA 11601), RSA I160H, <br />segments <br />RSA1080B <br />Flat Creek <br />FC -1 <br />Upsize and replace the existing 3- <br />RSFCO50E <br />12" CSP culverts (RSFCO50D) with <br />a 1.5' x 5.0' box culvert. <br />Spring Creek <br />SC -1 <br />Upsize and replace the existing 2- <br />RSSC040B <br />30" CSP culverts (RSSCO50B) with <br />a 12' long pedestrian bridge. <br />Willamette Overflow <br />WO -1 <br />Upsize and replace the existing 18" <br />RSWO070D.1, RSWO070E <br />CMP culvert (RSWO070D) with a <br />66" CSP culvert. <br />WO -2 <br />Upsize and replace the existing 36" <br />RSWO110B.1, RSWO110C.I <br />CSP culvert (RSWOI10A) with a <br />60" CSP culvert. <br />WO -3 <br />Upsize and replace the existing 48" <br />RSWO090A, RSWO090Aa, <br />CSP culvert (RSWO080A) with a <br />RSWO090B, RSWO090C, <br />66" CSP culvert. <br />RSWO090F, RSWO090H <br />WO -4 <br />Regrade the existing open channel <br />RSWO090A, RSWO090Aa, <br />segments (RSWO090Aa, <br />RSWO090B, RSWO090C, <br />RSWO090B, RSWO090C, and <br />RSWO090F, RSWO090H <br />RSWO090D) from node 74405 to <br />78833 (724'). <br />WO -5 <br />Install a storage CP at node 77703 to <br />RSWO070D.1, RSWO070E, <br />provide approximately 124 acre -ft of <br />RSWO090A, RSWO090Aa, <br />storage. <br />RSWO090B, RSWO090C, <br />RSWO090F, RSWO090H, <br />RSWO110B.1, RSWO110C.I <br />For more detail regarding each of these projects, capital project fact sheets are provided in <br />Appendix A. <br />0:\25695978 Eugene RR -SC Final Basin P1an\Master P1anTINAL 2- 2010\Master_Plan 3- 11- 10_FINAL_ Word _Version.doc 3-12 <br />