My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - Hospital Update
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-09/22/04WS
>
Item A - Hospital Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:04 PM
Creation date
9/15/2004 11:38:02 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
9/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> <br /> Public Works <br /> Engineering <br /> <br /> City of Eugene <br />MEMORANDUM 858 Pearl Street <br /> Eugene, Oregon 97401 <br /> (541) 682-5291 <br /> (541) 682-5032 FAX <br /> <br /> Date: August 24, 2004 <br /> To: Mayor Torrey and City Council <br /> <br /> From: Mark Schoening, City Engineer <br /> 682-5243 <br /> <br /> Subject: Agate Street Extension Alternatives <br /> <br /> Introduction <br /> <br /> At the Council work session held on June 16, 2004, the City Council directed the City Manager to <br /> evaluate three alternatives to extend Agate Street to provide access to a potential hospital located on the <br /> EWEB site. The alternatives are shown on Attachments 1 and 2. This memo summarizes a qualitative <br /> engineering analysis of the three alternatives. <br /> <br /> All of the alternatives depart to varying degrees from "Avenue A" and "Avenue B" as identified in the <br /> Riverfront Research Park conditional use permit (CUP). Two of the alternatives use the existing Agate <br /> Street railroad underpass. One alternative includes a new railroad underpass. All of the alternatives <br /> include a new bridge to cross the Millrace. All of the alternatives would connect to the proposed <br /> Patterson Street railroad underpass. <br /> <br /> The estimated costs of the three alternatives are based upon work completed by CH2M Hill for estimating <br /> the costs of the Patterson Street underpass and the extension of Avenue A. <br /> <br /> Street Alternative 1 <br /> <br /> Description <br /> <br /> Except for its western terminus/railroad underpass, Street Alternative 1 follows the alignment depicted as <br /> "Avenue A" in the Riverfront Research Park CUP approved by the City in 1989. The street is a <br /> continuation of the (now partially constructed) Riverfront Parkway on the north side of the railroad tracks, <br /> extending the Riverfront Parkway westward. Alternative 1 includes a western terminus for the street that <br /> differs from that in the CUP. In the CUP, the western end of"Avenue A" connects to the existing at- <br /> grade railroad crossing at the intersection of Eighth Avenue and Hilyard Street. Alternative 1 proposes a <br /> different connection/terminus for "Avenue A." Under Alternative 1, "Avenue A" would be extended <br /> westward a few hundred more feet, beyond the boundaries of the CUP. Patterson Street would be <br /> extended north for about 600 feet and a new Patterson Street railroad underpass would be constructed <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.