Laserfiche WebLink
Goodpasture Island Road from Kingsley Road to 1,250 feet north of <br />Valley River Drive <br />Project Description: This project included the rehabilitation of Goodpasture Island Road from <br />Kingsley Road to 1,250 feet north of Valley River Drive (near Delta Ponds Bridge) in north <br />Eugene. <br />Treatment Methodology: Pavement testing confirmed that this section could be rehabilitated <br />with an inlay treatment (remove existing and repave same pavement thickness) of 2 inches of <br />asphalt pavement. There were some sections that only required a seal treatment. <br />Costs: Total project costs, from all funding sources, are estimated at $196,000. <br />Total Bond Funds Programmed to the Project = $ 448,000 <br />Total Projected /Actual Bond Funds Used = $ 193,000 <br />Difference = $ 255,000 <br />Because some sections only required a seal treatment, project costs were less than anticipated <br />in 2008. <br />Additional Sources of Funding: Stormwater and wastewater utility funds. <br />Project Photos: <br />2012 SRRP REPORT <br />Goodpasture Island Road pre- construction <br />Goodpasture Island Road post- construction <br />