My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4: Ordinance Levying Assessments for 3rd/4th Connector
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 05/08/06 Meeting
>
Item 4: Ordinance Levying Assessments for 3rd/4th Connector
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:51 PM
Creation date
5/4/2006 10:18:42 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/8/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Paving 7-foot (per front foot) $ 65.00 <br />Paving 10-foot (per front foot) $ 90.00 <br />Sidewalk (per square foot) $ 6.00 <br />Wastewater (per square foot) $ .35 <br />Wastewater service (per each) $3,000.00 <br /> <br />Total Estimated Assessable Cost $ 427,851 <br />Total Estimated City Cost $1,258,433 <br /> <br />Total Estimated Project Cost $1,686,284 <br />Property owners were notified of the final assessment hearing ten (10) days prior to the hearing as <br />required by Eugene Code. The final assessment hearing was held on April 12, 2006, to review the final <br />project cost, consider comments on the proposed final assessments, and to provide evidence to be <br />included in the ordinance levying the assessments by the City Council (see Hearing Official Minutes). <br />Costs were distributed per Eugene Code 7.175, and as outlined in the council-adopted Hearings Official <br />findings and recommendations, and the resolution forming the LID. <br /> <br />Below are the final unit assessable costs: <br /> <br />Paving 7-foot (per front foot) $ 67.23 <br />Paving 10-foot (per front foot) $ 96.05 <br />Sidewalk (per square foot) $ 6.06 <br />Wastewater (per square foot) $ .48 <br />Wastewater service (per each) $3,488.00 <br /> <br />Total Final Assessable Cost $ 476,988.30 <br />Total Final City Cost $1,367,531.10 <br /> <br />Total Final Project Cost $1,844,519.40 <br /> <br />The non-assessable City share for this project is funded from Transportation SDCs and Stormwater <br />SDCs. The Transportation SDC portion is $1,160,160.00 and the Stormwater SDC portion is <br />$203,145.00. The Metropolitan Wastewater Management Commission (MWMC) will reimburse the <br />City $4,225 for adjustment work to their facilities. The nonassessable costs that the City pays for <br />include additional width of paving, intersections, medians, bike lanes, street lights, street trees, and non- <br />assessable storm drainage system costs. Assessment financing, a 10-year payment plan through the <br />City, is available to all property owners within the improvement district as identified by Eugene Code, <br />Chapter 7. <br /> <br />The final project costs were higher than estimated. This was due to additional street excavation costs to <br />stabilize the soft subgrade prior to paving, extra right-of-way costs for additional right-of-way needed at <br />the west end of the project for realignment of the intersection to address safety concerns, additional <br />storm drainage work due to underground springs, and higher utility relocation costs than estimated. <br /> <br /> <br /> L:\CMO\2006 Council Agendas\M060508\S0605084.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.