My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on EWEB Downtown Riverfront Property
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 06/17/13 Public Hearing
>
Item 1: Ordinance on EWEB Downtown Riverfront Property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2013 2:51:17 PM
Creation date
6/17/2013 2:41:37 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EWEB DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br /> <br />constructed in accordance with standards specified in EC 9.6505. The improved and relocated <br />Riverbank Trail, a multi-use path, will be lit in accordance with accessway lighting standards and <br />designed to accommodate emergency vehicles. Proposed S-DR Zone (Exhibit B S-DR Downtown <br />Riverfront Special Area Zone) development standards are consistent with those in the land use <br />code and will contribute to foster public safety and protect of public and private property. Based on <br />these findings, this criterion is satisfied. <br />(f) Compatibility of aggregate extraction with the purposes of the Willamette River <br />Greenway and when economically feasible, applicable sections of state law pertaining to <br />Reclamation of Mining Lands (ORS Chapter 517) and Removal of Material; Filling (ORS <br />Chapter 541) designed to minimize adverse effects to water quality, fish and wildlife, <br />vegetation, bank stabilization, stream flow, visual quality, noise, safety, and to <br />guarantee necessary reclamation. <br />The proposal does not involve aggregate extraction nor will it have any impact on existing <br />aggregate resources. This criterion does not apply. <br />(g) Compatibility with recreational lands currently devoted to metropolitan recreational <br />needs, used for parks or open space and owned and controlled by a general purpose <br />government and regulation of such lands so that their use will not interfere with <br />adjacent uses. <br />The 2006 Parks, Recreation & Open Space (PROS) Comprehensive Plan is adopted as an <br />aspiration and guiding document for the City and contains an inventory of existing parks, recreation, <br />and open space resources. PROS Appendix B identifies an existing multi-use path, a segment the <br />Ruth Bascom Riverbank Trail, on the subject site. Alton Baker Park is located across the <br />Willamette River, on the east bank of the river. The northern portion of the site abuts open space <br />owned by the City and associated with the Defazio Bridge. <br />As noted previously, a portion of the subject site is identified in the PROS Project and Priority Plan <br />as a proposed Metropolitan Park site for acquisition. The plan assigns the acquisition project a <br />Priority 1 level and allocates $1,500,000 in capital costs to “acquire land to provide significant <br />riverfront open space within [the] courthouse/cannery neighborhood.” The applicant proposes the <br />sale or transfer of 7.74 acres of land to the City for future cultural landscape, open space, and <br />recreation purposes and to add to the supply of significant riverfront open space in public <br />ownership. The identification of a portion of the subject size for park acquisition demonstrates the <br />proposed uses consistency with the PROS Plan and City lands currently developed to recreational <br />needs. <br />The Master Plan development process included extensive public involvement, as noted in the <br />findings for Goal 1 under EC 9.7730(3)(a), and an iterative design process that resulted in a <br />redevelopment concept centered on compatibility with nearby uses, including recreational lands, as <br />described in the Downtown Riverfront SAP (Exhibit A Downtown Riverfront Specific Area Plan). <br />The Master Plan envisions a green redevelopment of the subject property, with approximately eight <br />acres of dedicated public open space, new construction and adaptive re-use of buildings, <br />pedestrian-oriented streets connecting Downtown Eugene to the Willamette River, and a cultural <br />landscape that displays the ecological, social, industrial, and civic history of the place. It <br />establishes a framework of streets, open space, and redevelopment parcels as well as a set of <br />allowable uses and use requirements. <br />The proposal establishes the S-DR Zone (Exhibit B S-DR Downtown Riverfront Special Area Zone) <br />as a special area zone. The S-DR Zone was designed with specific intent of compatibility with <br />nearby uses including recreational lands. The Master Plan uses a modified version of the C-2 <br /> Cameron McCarthy FINAL SUBMITTAL | December 5, 2012 <br />{00091176;1 } <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.