My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on EWEB Downtown Riverfront Property
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 06/17/13 Public Hearing
>
Item 1: Ordinance on EWEB Downtown Riverfront Property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2013 2:51:17 PM
Creation date
6/17/2013 2:41:37 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EWEB DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br /> <br />Commercial Base Zone permitted uses as a guide for determining future allowable uses on the <br />subject site. The Master Plan promotes a mix of diverse, compatible, and pedestrian-friendly uses <br />as the prevalent land use pattern. The S-DR Zone includes height standards that restrict the <br />maximum height of buildings as development approaches cultural landscape and open space areas <br />adjacent to the Willamette River, thus creating a step-down effect that limits the scale of buildings <br />near recreational areas. The maximum height of buildings in the proposed S-DR/CL sub-district, <br />the designation for cultural landscape and open space areas, is 30 feet consistent with maximum <br />height standards in the NR and PRO Zones. <br />The proposed S-DR Zone regulations are designed to ensure compatibility with adjacent uses. The <br />above findings demonstrate the proposals compatibility with recreation lands, parks, and open <br />space owned by the City. Based on these findings, this criterion is satisfied. <br />(6) When site review approval is required, the proposed development will be consistent with the <br />applicable site review criteria. <br />The proposal does not involve or require Site Review. This criterion does not apply. <br />(7) The proposal complies with all applicable standards explicitly addressed in the application. <br />An approved adjustment to a standard pursuant to provisions beginning at EC 9.8015 of this <br />land use code constitutes compliance with the standard. <br />The above findings demonstrate compliance with applicable standards explicitly addressed in this <br />application. No adjustment to standards are requested or needed. Based on these findings, this <br />criterion is satisfied. <br />Willamette Greenway Permit Conclusion <br />Based on the above findings, the request is consistent with applicable criteria. <br /> Cameron McCarthy FINAL SUBMITTAL | December 5, 2012 <br />{00091176;1 } <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.