Laserfiche WebLink
Chris Watchie wraps up the meeting by thanking participants for coming, reminding <br />participants to leave their opinion forms on the tables for collection, reviewing the next <br />steps, and taking final questions. Meeting ends at 8:00pm. <br />Example of Public Input Form <br />South Willamette Street Improvement Plan <br />Community Forum #2: Evaluate the Alternatives <br />1.Please check the 3 alternatives that you would like the City to evaluate in <br />more depth: <br /> 1: 4-Lane <br /> 2: 4-Lane with Center Left-turn Lane <br /> 3: 3-Lane with Bike Lanes <br /> 4: 3-Lane with Buffered Bike Lanes <br /> 5: 3-Lane with Wide Sidewalks <br /> 6: 2-Lane with Bike Lanes, Median & Roundabouts <br /> I don’t know <br />2. Are there modifications you suggest to the above checked alternatives (such <br /> If so, please describe on the back of this <br />as width of lanes, sidewalk, etc.)? <br />sheet. Suggestions that expand the project beyond the current right of way <br />(60 feet) cannot be included in the short-term. <br />Website: eugene-or.gov/SWillametteStreet. Contact: Chris Henry, 7 <br />,541-682-8472, Public Works Engineering, 99 E. Broadway, <br />Chris.C.Henry@ci.eugene.or.us <br />Ste. 400, Eugene, OR 97401 <br />