Laserfiche WebLink
South Willamette Concept Plan <br />Plan for Climate Change and Energy Resiliency <br />• Reinforces existing 20 minute neighborhood <br />where people can meet most of their daily <br />needs within a 20 minute walk. Sets the stage <br />for access by more people using different <br />modes <br />• Plans for implementation of the Pedestrian <br />Bicycle Master Plan with inclusion of improved <br />bicycle and pedestrian connections. <br />• Sets long term vision for Willamette Street <br />through the "South Willamette Street <br />Improvement Project. <br />• Creates street typologies that emphasize a <br />safe, inviting walkable public realm, with wide <br />sidewalks, landscaping and buildings, rather <br />than parking lots, located near the sidewalk. <br />Provide for Adaptable, Flexible and Collaborative <br />Implementation <br />• Gradual implementation through market <br />forces and Community Investment Plan <br />Protect, Restore and Enhance Natural Resources <br />• Protects farm and forest land by implementing <br />strategy for more jobs and housing within the <br />urban growth boundary <br />• Enhances landscaping and urban tree cover <br />promoting health and livability <br />City of Eugene ■ 65 <br />